60 likes | 156 Views
OT Software Status 38 th LHCb Software Week Alexandr Kozlinskiy, NIKHEF 07.10.2009. Outline. Preparation for Data Simulation and reconstruction. Preparation for Data.
E N D
OT Software Status 38th LHCb Software Week Alexandr Kozlinskiy, NIKHEF 07.10.2009
Outline • Preparation for Data • Simulation and reconstruction
Preparation for Data • We need to update TR-relation to more realistic one (from cosmic data we know that TR-relation from beam test work quite well) drift time VS distance and TR-relation
Preparation for Data • Upload first alignment of C-frames Misalignment of frames Residuals (biased) σ = 240 μ • Prepare algorithms for module T0 calibration and TR-relation calibration (algorithms are ready but need some tuning – more configuration options, xml-output)
Simulation and reconstruction • How to deal with noisy and dead channels? • need to add flag to mark hit if it goes from noisy channel • remove them in reconstruction (prepare algorithms to read xml-description of noisy and dead channels) • Study of the delta rays is ongoing • compare cluster size for cosmic data and MC with and without delta rays
Summary • OT software is in good condition • Final preparation for data taking (calibration algorithms, upload first alignment and realistic TR-relation)