1 / 6

PMO Support for the XBT SOOP

PMO Support for the XBT SOOP. PMO-III, 23-24 March 2006, Hamburg, Germany. Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team. Specific Functions. Collect paperwork and the diskettes of high-resolution delayed-mode profile data.

abdalla
Download Presentation

PMO Support for the XBT SOOP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PMO Support for the XBT SOOP PMO-III, 23-24 March 2006, Hamburg, Germany. Graeme Ball VOS Program Manager, Australia Chairman, Ship Observations Team

  2. Specific Functions • Collect paperwork and the diskettes of high-resolution delayed-mode profile data. • View the XBT drops and provide immediate feedback. • Resupply consumables: • Probes; and • Disks & paperwork. • Perform a TEST drop.

  3. Specific Functions • Check the laptop computer: • Date & time; • Screen; • Keyboard; and • Hard disk. • Check cables & launcher: • Wear or damage; and • Intermittent problems. • Check transmitter.

  4. Specific Functions • Maintain & establish liaison with the crew: • Early warning detection of route/crew changes. • Confirm the understanding of the sampling instructions: • Transect start & end points; • Frequency of XBT drops; and • Criteria for repeat drops. • Provide training to new operators.

  5. Specific Functions • Provide QC feedback to the operators: • Compliment on the good drops & any repeat drops; and • Advise when repeat drops should have been performed.

More Related