Purpose of this meeting: Show summary of WP2 tasks Prepare for the meeting next week WP2 has 3 slots for presentations: Thursday morning plenary (summary of today’s discussion); Thursday morning parallel (key lessons from LHC 2011 operation);
E N D
Purpose of this meeting: • Show summary of WP2 tasks • Prepare for the meeting next week • WP2 has 3 slots for presentations: • Thursday morning plenary (summary of today’s discussion); • Thursday morning parallel (key lessons from LHC 2011 operation); • Friday public meeting (baseline scenario -> April meeting) • Summary of WP2 resources and deliverables • Preparation for the organization within each task • Discussion and organization of WP2 tasks • Each task leader will present a proposal for topics. • Each task leader will present a proposal for the modus operandi • Discussion and organization of WP2 • Discussion on WP webpage. Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 1 WP2 HL-LHC meeting 11. November 2011
WP2 Tasks within the EU funded HiLumi Design Study: • Task 2.1: Coordination and Communication Andy & myself • Task 2.2: Optics and Layout Bernhard Holzer • Task 2.3: Particle Simulations Massimo Giovannozzi • Task 2.4: Collective Effects Elias Metral • Task 2.5: Beam-Beam Effects Werner Herr • Task 2.6: Beam Parameter Andy & myself Preparation for 1st General HL-LHC Meeting • Additional WP2 Tasks outside the EU funded HiLumi Study: • Task 2.7: Intensity limitation from existing LHC hardware Ralph Assmmann O. Brüning – BE-ABP 2 WP2 HL-LHC meeting 11. November 2011
Summary of WP2 Resources: • We need to identify a corresponding resource loaded plan • We can assign more, but not less resources for each partner Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 3 WP2 HL-LHC meeting 11. November 2011
Summary of WP2 Deliverables: • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 4 WP2 HL-LHC meeting 11. November 2011
Interaction with other work packages: • WP1: Project management • WP3: Magnet design • IR layout for heat deposition studies • iteration on magnet length and aperture • Field quality and aperture specifications etc • Corrector package specification • WP4: Crab Cavities IR design with crab cavities & Beam parameters and performance etc. • WP5: IR collimations IR design and layout • WP7: Machine protection • WP8: Collider-Experiment Interface • WP10: Energy deposition and shielding • WP11: 11 T dipole two-in-one cryo collimatorsstudies • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 5 WP2 HL-LHC meeting 11. November 2011
Modus Operandi: • communication between collaborators • News Letters & email lists; Wiki pages; meetings [EVO or real] • Within each task and within the WP2 • Communication between work packages • News Letters & email lists; Wiki pages; meetings [EVO or real] • Frequency of meetings • EVO and real • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 6 WP2 HL-LHC meeting 11. November 2011