1 / 17

Intermountain Construction

Intermountain Construction. Right Of Way Maintenance Company. 1997.

abra-porter
Download Presentation

Intermountain Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intermountain Construction Right Of Way Maintenance Company

  2. 1997 • Intermountain Construction began leak surveying for Williams Field Service. During this first year we became familiar with Williams’ policies, pipelines, locations,and personnel. Also during this time we found a significant amount of Natural Gas leaks.

  3. 1997 • In addition to leak surveying we began a system of notifying property owners in the jurisdictional areas when we would be leak surveying on their property. • We also took on the task of compiling and monitoring of the Gathering System location books. Every year we update our Customers location books as well as keeping a complete record of our own. • We became in compliance with the DOT Regulation 49 CFR 40 By implementing a drug and alcohol plan. Our drug and alcohol plan mandates pre-employment as well as random screenings.

  4. October 1998 • Intermountain began taking care of onecalls for the Tres Rios gathering district of Williams field Service. • Intermountain takes a serious and fastidious approach to one calls. Our goal is 100% accuracy and safety.

  5. May 2000 • Williams Field Service restructured and Intermountain became responsible for a larger area of Williams Field Service. We became responsible for one calls and leak survey in all Four Corners Area districts of Williams Field Service.

  6. August 2000 • Intermountain began installing carsonite signs on the right of way rehab project from AM 149 to Kutz station.

  7. OCTOBER 2000 • Intermountain Construction began a safety program. We developed a safety manual and implemented monthly safety meetings as well as weekly tailgate meetings.

  8. February 2001 • In February 2001 all of Intermountain Construction personnel became certified with a Basic Safety Certificate that includes: • 1910.146 Confined Space Awareness • 1910.157 Fire Fighting, Incipient Stages • 1910.1200 Hazard Communication (HazCom) • 1910.120 HAZWOPPER Awareness • 1910.147 Lockout/Tagout • 1910.132 Personal Protective Equipment • 1910.34 Respiratory Protection

  9. 2005 • Intermountain Construction now offers & will continue to offer • Line locating or One Calls • Jurisdictional & Non-Jurisdictional Leak Surveys with reports • Carsonite or Post installation • Valve Greasing • GPS Mapping and Plotting • AS Builts • Emergency shut down procedure manuals with photos and driving instructions • Road Excavation and Maintenance • Brush cutting on Pipeline ROW and Seeding • DOT Reports • CDP Environmental Clean Up • Hydro Excavation ( Vac truck/ Pot Holeing)

  10. Qualifications • We are in DOT compliance with our drug and alcohol program • We carry five million dollars in liability insurance • We are also Operator Qualified through • NCCER • ISNetworld • Driver Licenses for all employees verified through SAMBA “Status, Driving records, Etc…”

  11. 2006 Intermountain Construction becomes Integrity Pipeline Service, Inc. Full Service Right of Way Maintenance Company

  12. Divisions • Intermountain Construction, Inc. • Integrity Pipeline Service, Inc. • Operator Qualifications Testing Center

  13. Earl Bell & Barbara Bell Board of Directors Barbara Bell Finance Director Scott Robinson General Manager Pipeline Service Technician III PipelineServiceTechnicianIII Billing Clerk Robert Wilson Field Supervisor Lupe Samora Office Manager Jason Nigel Field Supervisor PipelineServiceTechnicianII PipelineServiceTechnicianII OneCallAdministrator PipelineServiceTechnicianI Pipeline Service Technician I Human Resource Coordinator Organizational Chart

  14. Integrity Pipeline Services • Earl Bell & Barbara Bell - Board of Directors • Barbara Bell - Financial Manager • Scott Robinson - General Manager

  15. Original Customer Base • Williams Field Serive • Teppco GP, Affilates • Enterprise Mid America • ChevTexaco • ConocoPhillips • XTO Energy • Burlington Resources • Peoples Energy • Pogo Production

  16. New Services Coming Soon COMPLETE RIGHT OF WAY MAINTENANCE • Depth Surveys and Line Profiling • Increased Mapping Services

  17. QUESTIONS 505-334-8035 Go to the Contact us link on our Website THANK YOU!

More Related