Employer Consultation Innovation Centre Daresbury July 2, 2009. New-Build Nuclear – A Review of Labour Market Research. Dr Brian P Murphy – Director, Science and Research. UK Energy Future (without New-Build Nuclear). 75 GWe Capacity 63 GWe Peak Baseload?. Nuclear.

acton
Download Presentation

New-Build Nuclear – A Review of Labour Market Research

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Employer Consultation Innovation Centre Daresbury July 2, 2009 New-Build Nuclear – A Review of Labour Market Research Dr Brian P Murphy – Director, Science and Research

  2. UK Energy Future (without New-Build Nuclear) • 75 GWe Capacity • 63 GWe Peak • Baseload? Nuclear

  3. UK Nuclear Legacy 1956 – 2008 1917 Ernst Rutherford • 1956 Calder Hall - world’s first • 21 Reactors - closed • 19 Reactors - in generation • 1 new PWR in 1995 • 1 Reactor beyond 2023 • 11GWe output • 15-17% baseload 2017 New-Build Nuclear ?

  4. UK Nuclear Renaissance 2009+ ? Zero Carbon Energy Security Energy Density • New Nuclear Site Nominations • 11 (2009) • 12+ GWe • 2012 build start • 2017+ operation • Replacement ambition? • Higher baseload?

  5. UK Nuclear Labour Market • Deliver the skills picture • Understand what skills are required and when

  6. Cogent – “Renaissance” series LMI Publications 2009

  7. UK Nuclear New-Build Labour Market DECC & BIS

  8. NDF - New-Build Development • PWR New-Build Model infrastructure, construction, operation • Sensitivity to Design EPR AP1000 • Modular Methodology

  9. UK Civil Nuclear Industry & Workforce Workforce • Job Contexts • Skill Levels • Age Profile Sectors • Energy Production (BE, Magnox North) • Decommissioning (NDA/SLCs) • Fuel Processing (Urenco, Springfields, Thorp) • New Build (Scenarios) • Supply Chain Analysis • Current Establishment • Demand Projections • Attrition rates • Supply-Demand Analysis • Scenario Sensitivity • Skills Gaps

  10. Nuclear Labour Market Classification Roles – Job Contexts 1. Energy Production Operations 2. Decommissioning Operations 3. Process Operations 4. Maintenance Operations 5. Safety & Security 6. Radiation Protection 7. Project Management 8. Engineering Design 9. Scientific & Technical Support 10. Business 11. Construction 12. Waste & Repository Operations 13. Commissioning Skills - Levels 1. Semi-Skilled 2. Skilled 3. Technician 4. Professional / Middle Manager 5. Senior Manager Core Roles Support Roles

  11. Nuclear Workforce – Job Contexts

  12. Nuclear Workforce - Region and Nation 2009

  13. Nuclear Workforce – Energy Production 2009

  14. Nuclear Workforce – Decommissioning 2009 Wales

  15. Nuclear Workforce – Skill Profiles

  16. Nuclear Workforce cf UK Workforce

  17. Demand – Generation to Decommissioning

  18. Demand – Extended Generation

  19. Expansion Demand – New Build

  20. Civil Nuclear Industry - Workforce Demand Gap up to 15,000 (incl contractors)

  21. New-Build Nuclear – Sectors • For each PWR, LMI projection • Design and Planning • (infrastructure construction) • Engineering Construction • Equipment Manufacture • Commissioning and Operation • Maintenance

  22. New-Build Job Contexts

  23. New Build - Construction

  24. New Build - Manufacture

  25. New Build – Nuclear and Non-Nuclear Skills

  26. Other Numbers – Apples and Pears? 1 new PWR

  27. Civil Other Manufacturers 500 off site Mechanical Electrical SC Operators 500 mostly site Operators 500 mostly site State of Play – Pixelated Module 1 PWR 2500 build and operate 1500 Induced national 1000 person-years 1500 commission 5,0000 jobs Per PWR 1000 operate 1000 Induced local

  28. New-Build Nuclear – SC Pinchpoints? Civil Capacity - low risk; small proportion of UK capacity Capability – risk = tolerance Electrical Capacity - low risk; two dominant UK suppliers Capability – risk = heavy electricals Mechanical Capacity - risk; dispersed UK supply Capability – risk = welding and NDE ManufacturingCapacity - global Capability – large forgings; reactor pressure vessels; prebuild design

  29. Why have we brought you here? • Objectives • • Report work in progress • • Obtain feedback on the working assumptions • • Priorities for further investigation and support to complete • Outcomes • • Validate working assumptions • • Clarity of Job Contexts and pinch-points • • Which enhanced skill levels? • • What is an acceptable level of occupational detail? • • Which critical, low volume, roles related to delivery of SQEP? • Establish an Expert Panel for New Build LMI