1 / 8

Importance Of Design Phase Before Construction Adel Sageer

Here is a slideshow with some basic information about the Importance Of the Design Phase Before Construction by Adel Sageer.<br>

adelsageer
Download Presentation

Importance Of Design Phase Before Construction Adel Sageer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Importance Of Design Phase Before Construction | Adel Sageer

  2. THE Procedure Any commercial construction project’s success depends on starting with a reasonable budget, an accurate timetable, and an adequately defined design plan. This procedure ensures that your designs are appropriately transformed into a fantastic result.

  3. There are Four points of pre-Designing Before Construction:- 1. Planning 2. Design Innovation 3. Financials 4. Permits

  4. Planing A project’s success is dependent on its planning. The design process begins with an initial meeting to discuss the vision, logistics, and ultimate project results with the industrial general contractor group’s key decision-makers and creative professionals. This should be a collaborative process where ideas and directions are explored to produce an exceptional completed result. The team will walk over the project’s architectural, physical, and economic needs and code requirements together.

  5. Design Innovation After that, competent design specialists create architectural, structural, and engineering drawings as needed. These designs should specify project parameters from the ground up, typically including artist depictions. Mockups and full explanations should be included with the plans.

  6. Financials Financial modeling and budgets should also be essential for the pre-construction and design phases. Throughout the pre-construction phase, conceptual estimates are frequently established, and when a design is finalized, actual cost estimates are updated. Subcontractors and suppliers should provide construction cost estimates, logistics information, and timetables.

  7. Permits Another vital stage that your general commercial contractors should manage on your behalf is permitting. It is critical to secure all necessary permissions to safeguard property value and assure code compliance and save money in the long term.

  8. Thank You Adel Sageer