1 / 39

Physics Laboratory

Antonis Leisos. Physics Laboratory. School of Science and Technology. Hellenic Open University. A sea top infrastructure for calibrating an underwater neutrino telescope. G. Bourlis, P. Christopoulou, N. A. B. Gizani, A. Leisos, P. Razis , A. G. Tsirigotis and S.E. Tzamarias.

adila
Download Presentation

Physics Laboratory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Antonis Leisos Physics Laboratory School of Science and Technology Hellenic Open University A sea top infrastructure for calibrating an underwater neutrino telescope G. Bourlis, P. Christopoulou, N. A. B. Gizani, A. Leisos, P. Razis , A. G. Tsirigotis and S.E. Tzamarias • the calibration principle using atmospheric showers • construction and performance of the prototype detector station • Monte Carlo Studies TeV Particle Astrophysics  2007 27-31 August 2007 Venice, Italy

  2. spase-amanda 1 km 2 km IceCube IceTop SPASE air shower arrays  calibration of AMANDA angular resolution and pointing !  resolution Amanda-B10 ~ 3.5°

  3. The General Idea… • Angular offset • Efficiency • Resolution • Position Physics ? C.R. composition UHE ν - Horizontal Showers Veto atmospheric background – Study background

  4. Isotropic on the top of the atmosphere BUT … ~4km ~20km

  5. reweighting Blind fit Okada model Pierre Auger: M. Are et al. Ast.Part. 14: 109-120 2000 Haverah Park (www.ast.leeds.ac.uk/haverah/havpark.html): 12km2 effective area and 2π coverage in φ for 10 years operation less than 100 detected showers with NESTOR: muon flux @ 4000m

  6. reweighting Blind fit Okada model The Concept Floating stations 3 stations with at 16 m2 scintillator detectors each NESTOR: muon flux @ 4000m • Angular offset • Efficiency • Resolution • Position

  7. HELYCON Station Single Station Set-Up GPS Scintillator-PMT Scintillator-PMT 1 m2 Scintillator-PMT ~20 m Scintillator-PMT Triangulation Shower Direction DAQ 4·(1W/counter)+30W(PC+electronics)

  8. Simulation Tools CORSIKA (Extensive Air Shower Simulation) GEANT4 (Scintillation, WLS & PMT response) Fast Simulation also available

  9. Simulation Tools DAQSIM (DAQ Simulation) HOUANA (Analysis & Track Reconstruction) Height (mV) Time (ns) Zentih (degrees)

  10. d L-dm (x,y,z) θc dγ Track Parameters θ : zenith angle φ: azimuth angle (Vx,Vy,Vz): pseudo-vertex coordinates dm (Vx,Vy,Vz) pseudo-vertex Simulation Tools GEANT4 Muon Propagation to KM3 HOU-KM3 Muon track (s) reconstruction

  11. Monte Carlo Studies- Outlook1014 - 5·1015 eV E~ 1014 - 5·1015 eV: 2500 showers/m2/year Single station detection: 351m2 effective area (depends on geometry and selection cuts) Multi-Station: separation <100m, better resolution E> 1016 eV: 1 shower/m2/year TO BE STUDIED 35% of the detected showers include a muon which arrives at the Neutrino Telescope (depth 4000m) with an energy >300GeV General Remark: 3 stations operating for 10 days can identify an angular offset with an accuracy of 0.15o Specifically…

  12. Monte Carlo Studies Atmospheric shower simulation by CORSIKA - muon transportation to the detector DEPTH by GEANT4 - Sea-Top Detector detailed simulation GEANT4_HOU Angular Resolution in Single Shower Reconstruction • Depends on: • Detector separation • Selection criteria • Shower direction • Typical Values • No cut: σ= 4.5ο • Total Collected Charge > 10 mips: σ=2.22ο • Total Collected Charge > 25 mips: σ=1.33ο • Total Collected Charge > 30 mips: σ=1.2ο PRELIMINARY Θrec-Θtrue

  13. Multi Station Set upimprove resolution – higher energies GPS Synchronisation Δt <±6ns using sawtooth correction

  14. curvature thickness Multi-Station Operation Monte Carlo Studies in Progress Time Delay (ns) Total collected charge [pe] Time Spread (ns) Total collected charge [pe]

  15. The HELYCON Detector Module GPS timestamp Scintillator 2 Scintillator 3 Station Server Scintillator 3

  16. HELYCON ReadOut Electronics 4 PMT Signal Inputs Trigger Ouput USB Port • HPTDC • 32 channels (LR) – 8 Channels (HR) • 25ps (HR) to 800 ps (LR) accuracy • Self Calibrating 25ps accuracy TDC GPS Input D. Loucas INP DEMOKRITOS

  17. Response to Showers trigger arrival time θ=31ο ±8ο ~60 mip’s 14.2ns ~50 mip’s 5.4ns ~10m Input A Input B Discriminator (1.5 MIP) Trigger

  18. discriminators Inputs Trigger DAQ based on TDS5052 Tektronix (5 Gsamples/s) Response to Minimum Ionizing Particles Scintillator A Lead Scintillator B

  19. Detailed Monte Carlo description At the Detector Center • Data - Monte Carlo Prediction Charge (in units of mean p.e. charge) Response to a MIP DAQ S/W based on LabView On-Line analysis - distributions PRELIMINARY Digitized Waveforms saved on hard disk

  20. Response to a MIP Detector Uniformity (the worst case) PRELIMINARY X Y Charge (in units of mean p.e. charge) Typical Mean Numb. of p.e. per m.i.p. : 23 (± 16% variation)

  21. Response to a MIP Detector Uniformity - Timing discriminators Inputs Trigger PRELIMINARY Scintillator A Lead Scintillator B ΔΤ consistent with the difference of optical path (fiber refractive index n=1.6)

  22. Timing vs Pulse Hight Input A Input B Discriminator (1.5 MIP) Trigger thickness Slewing Resolution

  23. Response to Showers PRELIMINARY PRELIMINARY zenith angle [degrees] zenith angle [degrees] Trigger Detectors > 1 mip Detectors A.and.B > 1.5 mip’s Trigger Detectors >1 mip Detectors A.and.B > 0.5 mip’s α=9.4±0.2

  24. B2 A1 A3 A2 B1 B3 Discriminator (1.5 MIP) Input C Trigger Lab Measurements (a) MC -Data μ=-0.1±0.3 σ=7.6 ± 0.2  Data ___ M.C. Prediction θΑ-θΒ μ=-0.06±0.05 σ=1.02± 0.03 • Deposited Charge per counter > 4 mips 6 Active counters Pull

  25. B2 A1 A3 A2 B1 B3 Discriminator (1.5 MIP) Input C Trigger Lab Measurements (b) MC Prediction GROUP A μ=0.1±0.6 σ=4.5± 0.5 DATA δθ=4.6 θm-θtr μ=0.01±0.1 σ=0.9± 0.1 Pull GROUP B μ=0.3±0.8 σ=5.2± 0.8 DATA δθ=5.6 θm-θtr μ=0.02±0.1 σ=0.9± 0.1 • Deposited Charge per counter > 4 mips 6 Active counters Pull

  26. 16m2 Scintillator Station 5m 1 m2 Scintillation Counter 19m dt=0 dt1 dt2 dt3 19m

  27. Time corrections

  28. Detection Efficiency Efficiency Events A hit is considered when there is more than 4 mips deposited charge

  29. Muon Propagation Accepted if muon with E>2TeV goes through km3 Geant Simulation (propagation & Energy Loss) μ track Zenith angle < 13 deg Muon Track Reconstruction (A. Tsirigotis talk) km3

  30. Muon vs Shower Axis

  31. Primary Zenith Angle Resolution • Deposited Charge per counter > 4 mips • Number of Hits > 10

  32. Primary Azimuth and Space angle Resolution • Deposited Charge per counter > 4 mips Number of Hits > 10

  33. Performance Plots

  34. discriminators Scintillator A Lead Scintillator B At the Detector Center • Data - Monte Carlo Prediction Inputs Trigger Time (ns) Charge (in units of mean p.e. charge) Charge  Data ___ M.C. Prediction

  35. Charge parameterization AGASA parameterization (S. Yoshida et al., J Phys. G: Nucl. Part. Phys. 20,651 (1994) Parameters depend on (θ,Ε, primary) “Mean particle density registered by an active counter”

  36. Primary Impact determination Absolute Position resolution ~ 0.5 m

  37. Performance Plots

  38. Telescope Resolution Telescope resolution ~ 0.1 deg Surface Area resolution ~ 1 deg Telescope’s resolution measurement Impossible σ=0.014 σ=0.062 σ=0.094 Inter calibration

  39. Conclusions The operation of 3 stations (16 counters) for 10 days will provide: • The determination of a possible offset with an accuracy ~ 0.05 deg • The determination of the absolute position with an accuracy ~ 0.6 m • Efficiency vs Energy and Zenith angle… • Resolution No!

More Related