1 / 20

Linking Relief, Rehabilitation and Development (LRRD) in Afghanistan

Linking Relief, Rehabilitation and Development (LRRD) in Afghanistan. LINKING RELIEF REHABILITATION AND DEVELOPMENT A two year EC funded project

adolfo
Download Presentation

Linking Relief, Rehabilitation and Development (LRRD) in Afghanistan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linking Relief, Rehabilitation and Development (LRRD) in Afghanistan

  2. LINKING RELIEF REHABILITATION AND DEVELOPMENT • A two year EC funded project • It aims to draw lessons from current experience to inform policy and programmes, for NGOs, donors, international agencies and governmental institutions. • The LRRD project focuses on the 6 following sectors: • Agriculture • Irrigation and water supply • Nutrition • Health • Urban Development • Education • And includes a team of • - 4 technical members from Groupe URD, • - two independent consultants, • - a pool of junior experts • a project coordinator, permanently based in Kabul • two translators and one logistician • And scientific support from headquarter

  3. Main Objectives • Learning and sharing lessons in this period of political and technical transition, through multi-sector review. • Increasing and sharing knowledge and experience by carrying out applied research in rural and urban settings in specific fields (including food and economic security and urban development): • 5 different agrarian systems throughout Afghanistan • 3 cities (small/middle/big) • In partnership with interested NGOs. • Contributing to the capacity building efforts of the relevant ministries and Afghan NGOs through trainings.

  4. Learning and sharing lessons • The process: • 2002 - 2004: 2 multi sector reviews within the framework of the Quality Project.(supported by ECHO, French government and SDC) • To date: • 2005- 2006 • - an in depth review for each sector • a 3-week multi sector field review • The main findings are presented through a conference or a workshop. At the end of the project, a final publication will be issued.

  5. A multi sector review • Purpose of the 3 week field mission: • To get a thorough understanding of the evolution of aid interventions and strategies; • to identify what have been the current opportunities and challenges; • To raise issues pertaining to both cross sector and sector approaches; • stimulate a debate with agencies and key stakeholders. • Methodology: • Information collected during a 3-week mission: • Review of pertinent available documents • Development of a common framework for analysis before the field trip. • Meetings conducted in Kabul and different provinces • Field visits and observations

  6. The selection of the itinerary: • Itinerary: • Kabul, Bamiyan, Samangan, Balkh, Baghlan, Kunduz, Takhar, Ghazni, Nangahar, Wardak. • Criteria for the itinerary: • Diversity of the provinces in terms of culture, geography and economy. • previously visited provinces during the Quality Project missions. • Balanced representation of different stakeholders (Afghan authorities, UN agencies, Afghan and international NGOs, donors, private sector) • Limitations • Logistic constraints: time, access • Security constraints • Language issues • New behaviours of the non state-armed carriers

  7. Agenda of the day • 8h30 – 8h45: presentation of Groupe URD, the LRRD project and methodology • 8h45 – 10h00: Presentation of the multi and cross sector review and discussion 15 minutes tea break • 10h15 – 11h30: In small groups: presentation and discussion of relevant issues and recommendations. • 11h30 – 12h30: Restitution of sector groups and conclusions.

  8. by Amélie Banzet, Christine Bousquet, Béatrice Boyer, Agnès de Geoffroy, Domitille Kauffmann, Peggy Pascal and Nicolas Rivière A multi and cross-sector approach LRRD Project

  9. AFGHANISTAN 2006 : processes taking place simultaneously • Positive processes: • Successful presidential and parliamentary elections; • End of the Bonn Process and entry in the London process; • Increased capacity of the Afghan authorities; • Still resolute engagement of the International Community • Negative processes: • Growing insecurity encroaching areas previously calm: Metastases from the GWT ? • Poppy remaining a difficult problem; • Reduction of the areas where civilian aid agencies can work: PRT ? • Question in the civil society of the net outcome of the PM election

  10. State Rebuilding At the central level • Improved organization at the central level • Clarification of roles and responsibilities within and between ministries: an on-going process • Pace of development of policies and strategies varies from one ministry to one other depending on external support • Nutrition and health • Water/agriculture • Urban sector • But ownership of the Afghan authorities in this process might not have been optimal • Limited contributions of NGOs in policy making and strategies design • Financial sustainability is a key challenge

  11. State Rebuilding At provincial level • Reinforcing of GoA representation: structures have been revised, clarification of roles, responsibilities and functions • Provincial Coordination Body (PCB): A recent initiative to improve multi-sector coordination • Capacities and means are still limited despite the ongoing administrative reform (PRR process) • Wide disparities in terms of competences and limited women representation • Issue of governance • What should be the roles and responsibilities of the district administration?

  12. Relations between aid stakeholders and the communities (1) • Communities are increasingly seen as key actors for their self promotion/development • What are the capacities of the communities for assessing needs, implementing project and maintaining new services or created assets? • →Two key priorities: raising community awareness and capacity building • Increased community participationto improve ownership and sustainability but persistence of conflicting approaches… • Although attractive, what are the limits of community participation?

  13. Relations between aid stakeholders and the communities (2) • Access to communities is challenged by a number of factors: security, geographical constraints and cultural barriers • Is there a trust towards the external aid actors (NGOs and GoA)? Building it is a complex undertaking • Behaviors inherited from the emergency period and still encouraged today

  14. Elaborating strategies in a volatilecontext Changing context Institutional Framework Donor’s policy Hostility towards NGO’s Multitude of actors (private sector, PRT,communities) Physical accessibility Funding uncertainty Security Core NGOs’ strategic elements • Degree of financial independence • Length of previous experience in Afghanistan • Mandate • Technical expertise • Responsiveness (Management, communication, Accountability) Prioritiessetting Financial vulnerability Survival Legitimacy Principles Added value Main strategies Windows of opportunity (advocacy, vulnerable groups, research, etc.) Broaden the scope of intervention Implementing partners (NSP, PPA)

  15. Opportunities and challenges within the LRRD framework Social services • Scaling up in terms of geographical coverage and scope of activities which place extra demands on human resources and NGO internal systems • For education, major efforts on harmonizing service delivery but still some conflicting views on participation and quality • For health, building new skills and competences • In the health sector potential for building public – private partnership?

  16. Opportunities and challenges within the LRRD framework Social services • Strategies • General trend for NGOs to implement national policies, which questions the role and the capacity of the GoA in the future • NGOs implementing innovative projects for best practices and for marginalized groups. • NGOs with added value at provincial level?

  17. Opportunities and challenges Socio-economic sectors

  18. Coordination mechanisms Afghan State International community Central Provincial Consultative UNAMA NGO Embassies Groups International conferences Projects and programmes Communities Multilateral Bilateral Private sector Afghan State Funding mechanisms trends

  19. Past and current trends • Channelled through or outside GoA Structures • Sector and geographic distribution of donor involvement • pooling of funds (health, security, governance) • short term versus longer term (micro finance); • slowly developing absorption capacity and still many difficulties to disburse funds according to planning • Fund availability for NGO depending on sector and strategy

  20. AFGHANISTAN 2006 : processes taking place simultaneously • Positive processes: • Successful presidential and parliamentary elections; • End of the Bonn Process and entry in the London process; • Increased capacity of the Afghan authorities; • Still resolute engagement of the International Community • Negative processes: • Growing insecurity encroaching areas previously calm: Metastases from the GWT ? • Poppy remaining a difficult problem; • Reduction of the areas where civilian aid agencies can work: PRT ? • Question in the civil society of the net outcome of the PM election

More Related