1 / 24

Status of Pixel Offline Software

ID week CERN, October 28 th 2013. Status of Pixel Offline Software. F. Djama , Ph. Grenier , S. Miglioranzi. Introduction. LS1 activities Be ready for commissioning and data taking with IBL, nSQP and DBM.

adriel
Download Presentation

Status of Pixel Offline Software

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ID week CERN, October 28th 2013 Status of Pixel Offline Software F. Djama, Ph. Grenier, S. Miglioranzi

  2. Introduction • LS1 activities • Be ready for commissioning and data taking with IBL, nSQPand DBM. • Consolidate and improve present software. • Include radiation effects in simulation and reconstruction. • Outline • Simulation: • Geometry • Digitization • Reconstruction • Clusterization • Performance • Tracking • B-tagging • Software

  3. Geometry S. Elles Last months dedicated efforts to deliver a more realistic updated geometry description for the detector and services. New geometry tag (ATLAS-IBL(3D25)-04-00-01) includes: • last IBL geometry updates. • IPT, IST, ISIS (Inner Positioning and Support tubes). • nSQP (new Service Quarter Panel). • new beam pipe. • DBM (Diamond Beam Monitor). current geometry is very close to the final one. Somemechanical parts description might slightly change (endblocks, stave rings, ..). Short term plans: Validate in the next days this new description.  freeze it for DC14 ISIS (IST support) DBM IST nSQP

  4. Geometry S. Elles New material budget estimations for the latest geometry available: • detector-only (as in TDR version) • including also Beam Pipe + structures + services https://twiki.cern.ch/twiki/bin/viewauth/Atlas/SimulationOfPixelGeometryAndMaterialUpgrade2013

  5. Digitization S. Miglioranzi, M. Klein, M. Rudolph, F. Djama • IBL requires different digitization models (sensors technology) • New PixelDigitizationpkg in place: • Code has been optimized. • Different classes per charge model (SiPl, Si3D,DBM). • DBM model exist need to be imported in head tag. • Extension of DB and Services to IBL: • SW already delivered. • Need to prepare last IBL-aware DB folders. • DBM not included yet  needs latest geo tags. W.-M. Yao

  6. Digitization of 3D Sensors at high incidence S. Terzo First data/MC comparison for high incidence on 3D sensors. 120 GeV pion at an incidence of θ = 80 (η =2.4 in ATLAS). Digitization: inductive model. Agreement should be better if we check incidence in real data: perform the sensor alignment. Model already in the IBL cache version of the ATLAS software

  7. Digitization with Irradiation Effects C. Bertsche, M. Bomben, Ph. Grenier, G. Piacquadio • A lot of progress in implementing charge models for planar sensors, testing and debuging: • Electric field and Ramo potential mapping from TCAD. • TCAD reproduces well the chosen charge model (V. Chiochia et al., Nuclear Science, IEEE Transactions on , vol.52, no.4, pp. 1067- 1075, Aug. 2005) • Charge models validated by old results up to 6 1014neq/ cm2 . • Holes become important in case of trapping ! • Next step: validate charge models after irradiation with test beams of irradiated sensors. • A similar activity started for 3D sensors . M. Povoli

  8. Ramo potential: TCAD simulations Ramo potential: one slice of a 3D simulation (X-Z plane) 3D simulation of ATLAS pixels: ¼ of a 3x3 matrix Ramo potential: profile along the bulk M. Bomben - TCAD simulations of planar sensors - ATLAS Pixel week - CERN, 13/06/2013

  9. NN-Clusterization for IBL F. De Lorenzi • NN clustering is default pixel clustering algorithm  need to be re-trained for IBL. • In dense cores of high-pt jets, charges deposited by multiple particles can merge into a single cluster  degraded cluster resolution. • NN clustering splits merged clusters and computes positions and errors of subclusters. • NN training exercise of October 2012 failed (performances not as expected). • Some bugs identified in training code, old MC samples had geo and track problems • New training has now started (100K JZ4W from latest IBL+ATLAS prod used)  first results are promising… Histograms contain hits from all 4 pix barrel layers; Residual: NN-computed position - G4 position

  10. Analog Clusterization for IBL M. Klein • What is used at the moment when running with IBL-geometry is digitalclustering. • Need to make the code more flexible to steer different clusterization algorithms for different layers. • Develop an analog clustering for IBL. • Possible optimization for the future: • use NN for cluster splitting. • analog position for the subclusters. • Work started few days ago…

  11. Tracking Performance with IBL W.-M. Yao, M. Kwok, Y. Wu, Y. Fang, M. Garcia-Sciveres • Tracking performances vs PU (40,60,80,100). • At high pileup loss of efficiency & fakes increasing rate have been observed. Track fake rates vspt LF track effvspt LF track effvsη

  12. Tracking Performance with IBL W.-M. Yao, M. Kwok, Y. Wu, Y. Fang, M. Garcia-Sciveres • Effects of dead modules on tracking quantities havealso been studied: • Disabling5,10,15% of modules (including IBL) • The degradation due to disabled modules up to 15%is modest at few % level

  13. Schorlemmer B. Di Girolamo G. Piacquadio S. Pires M. Kwok W.-M. Yao Y. Fang M. Garcia-Sciveres B-tagging with IBL 0 IBL + 44 disabled Pix modules (with repairs) 5 IBL + 44 disabled Pix modules (with repairs) 5 IBL + 167 disabled Pix modules (no repairs) 5 IBL + 167 disabled Pix modules + readout ineff(no repairs) IBL 14TeV stdATLAS 14TeV WH-> l nu bbar MV1 μ=40 ttbar IP3D+SV1 • High Pt performance will improve with NN-clustering. • A note in preparation: • ttbar samples, PU = 0, 60. • Realistic dead module scenario (after nSQP connection at SR1). • Optimization with b-tag performance group started. ttbar IP3D+SV1

  14. Other Topics L. Franconi • Connectivity and ByteStream coding for IBL : • Realistic IBL Cabling Map  joint effort of detector/DAQ/DCS group. • Proposal of FE-I4 ByteStreamCnv (P. Morettini) currently coded (with help of S. Roe). • Workaround for HLT and FTK: Dummy cabling Map (F. Djama) and FE-I3 inspired ByteStreamCnv (D. Emilyanov). • Luminosity-induced saturation effects : • At high lumi, hits will be lost due to buffer overflows and busy electronics. • Simulating FE-I3 readout process: • Bunches scheme. • Realistic ToT. • Goal: an inefficiency table (eta, lumi) to be used by digitization. • FE-I4 model also needed. • Next step: simulate MCCs. • Condition Data Base : • Folders and Services coded. • Ready to be implemented in a release. J. Black, T. Nelson W.-M. Yao

  15. S. Miglioranzi Releases and core sw: • IBL developments and validation studies are currently performed in rel 17.3.X(.Y). • Validated caches used for IBL+ATLAS MC Production so far : 17.3.10.1.Z, IBLProd. • IBL+ATLAS MC Prod twikihttps://twiki.cern.ch/twiki/bin/viewauth/AtlasProtected/AtlasProductionGroupMC12Upgrade • Last validated cache was 17.3.11.1 (contains Supercell info). • Plan to release a full build 17.3.12 in the next days (this week?) including new geo-related sw. • 17.3.12 will be “in sync” with 17.2.12: •  differs for: 64bit, supercell and TrigMC tags. T0 upgrade DC14 releases plans: 17.2.11.13 Atlas Prod 17.2.12 17.7.0.5 Atlas Prod 17.3.12 17.3.11.2 Atlas Prod https://twiki.cern.ch/twiki/bin/viewauth/Atlas/InDetIBL_Example 18.1.0

  16. Software Improvements S. Miglioranzi • Large and important activity to improve our software: • Identifiers • Hard coded numbers • Prepare easy ITK implementation • Code cleaning • … • Coordinated by S. Miglioranzi. • PixelDigitization package: M. Klein • Geometry: S. Elles • Conditions: W.-M. Yao • We receive valuable help from J. Chapman, N. Styles, R.D. Schaffer…

  17. Summary 2012/2013 have been crucial years for the development and finalization of the IBL software  but still tight schedule ahead ! • Current geometry simulation is realistic: • Preliminary validation is ongoing and PhysVal should start soon. • Plans to use it for DC14. • Only minor changes foreseen in the future. • Digitization is in place: • Digitization models available for all the different technologies. • Reconstruction: • Existing reconstruction software robust  already working for IBL. • Optimization can be done and it has already started. • Clusterizationis a hot topic  more people involved on that now. • Involvement of other CP groups has started  vital to keep close. connection and feedback to get the best performance out of IBL.

  18. Schedule Forseen schedule in april 2013: Hopefully only few weeks delay…

  19. Backup

  20. Geometry – DBM & DBM services Included in the new ATLAS-IBL(3D25)-04-yy-zz tags ISIS (IST support) & IST nSQP

  21. Geometry – Run1 Pixel Detector • Pixel current geometry description: cooling fluid modeling: • Studies of hadronic interactions in cooling fluid. • In pixels show large data/MC discrepancy •  better modeling needed. Data MC hadronic interactions in cooling vs Z • PP0 region required optimization/improvement: • Inner PP0 material overestimated in current • GeoModel 2.3<|η|<2.5 • SCT extension eff studies sensitive to PP0 region • New improved description by looking at construction • files and directly to the dismounted SQP in SR1 SCT extension efficiency ATLAS-GEO-20-20-04 https://indico.cern.ch/getFile.py/access?contribId=3&resId=0&materialId=slides&confId=252811

  22. Tracking Activities ID Alignment: • Code developments/adaptation to include IBL already started. • Alignment of the IBL/Pixels during cosmic runs. • Further understanding of Silicon deformation. • Improving run-by-run alignment, reduce track parameters systematics… Vertex Reconstruction: • Improve the power of the vertex reconstruction as in-time pile-up estimator in the next run. • Work is ongoing on the seeding algorithm. • New Tracking +IBL re-optimization is starting now…

More Related