October 2008 Phase IVB Construction

October 2008 Phase IVB Construction. Photographs by Steve Bousquin & Brent Anderson. October 8, 2008. Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008.

ady
Download Presentation

October 2008 Phase IVB Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. October 2008 Phase IVB Construction Photographs by Steve Bousquin & Brent Anderson

  2. October 8, 2008 Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008

  3. Phase IVB Construction October 7, 2008 Scraped spoil at the north end of Phase IVB construction site. July 31, 2008

  4. October 7, 2008 Removing spoil from the spoil mound on the northwest floodplain of Phase IVB.

  5. Phase IVB Backfilling October 7, 2008 Removing spoil from the northwest floodplain of Phase IVB. The dump truck will bring the spoil material directly to C-38 for backfilling.

  6. October 8, 2008 Looking south down the C-38 from the north end of the Phase IVB construction area. This image shows the first plug that is intended to direct water flow around the construction site. October 8, 2008

  7. October 8, 2008 Looking southwest at the first plug from the northeast side of the Phase IVB construction area.

  8. October 8, 2008 Looking south the plug on the north end of the Phase IVB construction area. The plug is diverting the water around the construction site which is intended to create less turbidity downstream of the backfilling.

  9. October 7, 2008 Looking northeast at the plug that extends across the C-38 at the north end of the Phase IVB construction area. The bulldozer is pushing transported spoil material into C-38 downstream of the plug.

  10. October 7, 2008 Dumping and bulldozing to backfillC-38 at the north end of Phase IVB. July 31, 2008

  11. Dumping and bulldozing to backfillC-38 at the north end of Phase IVB. October 7, 2008