110 likes | 290 Views
October 2008 Phase IVB Construction. Photographs by Steve Bousquin & Brent Anderson. October 8, 2008. Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008.
E N D
October 2008 Phase IVB Construction Photographs by Steve Bousquin & Brent Anderson
October 8, 2008 Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008
Phase IVB Construction October 7, 2008 Scraped spoil at the north end of Phase IVB construction site. July 31, 2008
October 7, 2008 Removing spoil from the spoil mound on the northwest floodplain of Phase IVB.
Phase IVB Backfilling October 7, 2008 Removing spoil from the northwest floodplain of Phase IVB. The dump truck will bring the spoil material directly to C-38 for backfilling.
October 8, 2008 Looking south down the C-38 from the north end of the Phase IVB construction area. This image shows the first plug that is intended to direct water flow around the construction site. October 8, 2008
October 8, 2008 Looking southwest at the first plug from the northeast side of the Phase IVB construction area.
October 8, 2008 Looking south the plug on the north end of the Phase IVB construction area. The plug is diverting the water around the construction site which is intended to create less turbidity downstream of the backfilling.
October 7, 2008 Looking northeast at the plug that extends across the C-38 at the north end of the Phase IVB construction area. The bulldozer is pushing transported spoil material into C-38 downstream of the plug.
October 7, 2008 Dumping and bulldozing to backfillC-38 at the north end of Phase IVB. July 31, 2008
Dumping and bulldozing to backfillC-38 at the north end of Phase IVB. October 7, 2008