1 / 17

WMO STRATEGIC PLAN 2012-2015

WMO STRATEGIC PLAN 2012-2015. CAeM Hong Kong, China 03-10 February 2010. Topics. Guidance & directives by Cg/EC for next Strategic Plan Progress in the development of WMO SP & OP 2012-2015 Specific tasks of TC’s Summary. Guidance & directives by Cg/EC for next Strategic Plan.

ady
Download Presentation

WMO STRATEGIC PLAN 2012-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WMO STRATEGIC PLAN2012-2015 CAeM Hong Kong, China 03-10 February 2010

  2. Topics • Guidance & directives by Cg/EC for next Strategic Plan • Progress in the development of WMO SP & OP 2012-2015 • Specific tasks of TC’s • Summary

  3. Guidance & directivesby Cg/EC for nextStrategic Plan

  4. Guidancefrom Cg-XV, EC-LIX and -LX (2) • To develop a Strategic Plan and Operating Plan that is concise and that can be easily understood by different audiences including decision-makers • To base the strategic direction of the Organization on Global Societal Needs (GSN) • Describe expectations of stakeholders as well as priority areas • To use the “results chain”, i.e. Strategic Thrusts (ST) -> Expected Results (ER) -> Key Outcomes (KO) -> Deliverables -> Activities, as the structure of the strategic planning process • The framework of the SP should consist of the five Strategic Thrusts (ST) and eight organization-wide Expected Results (ER) • Facilitate inputs from the Members, RAs & TCs

  5. WMO’s results-based strategic planning

  6. Linkage between the next SP, OP and RBB SP OP (2012-15) KOn11 Del Act Budget GSN STn ERn1 KOn12 Del Act Budget Act Budget Del KOn13 Act Budget SECRETARIAT RBB (2012-15)

  7. 5 Strategic Thrusts 8 Expected Results 3 Global Societal Needs WMO Strategic Plan 2012-2015

  8. KO’s , KPI’s and Priority Areas • ST 1:Improving service quality and service delivery • ER 2: Enhanced capabilities of Members to reduce risks and potential impacts of hazardscaused by weather, climate and water and related environmental elements • KO 2.1: qualitymulti-hazard early warning systems in all NMHSs and improve the range and timeliness of the services. • Key Performance Indicators (KPIs): • NMHSs with strengthened multi-hazard early warning systems; • Collaboration with national emergency management systems and other national response systems in the development and delivery of services. • KO 2.2: NMHSs integrated into national development planning and disaster management systems. • Key Performance Indicators (KPIs): • catalogues and maps of potential weather, water, climate and environmental hazards • progress in implementation of the Hyogo Framework for Disaster Risk Reduction by NMHSs • KO 2.3:integrated approach towater hazards management (including drought?) • Key Performance Indicators (KPIs): • Manuals and Guidelines published under the QMF-Hydrology • Regional hydrological information systems established in trans-boundary basins

  9. Strategic Planning Documents • WMO Strategic Plan : High-level statement of strategic directions and priorities expressed through Strategic Thrusts and organization-wide Expected Results and Performance Indicators addressing the Global Societal Needs; • WMO Operating Plan: converts the organization-wide ERs into specific outcomes/ deliverables, indicators and targets • Secretariat Implementation Plan and budget: converts the organization-wide ERs into Secretariat specific outcomes/ deliverables, indicators and targets and links them to the planned activities and the Secretariat budget; • WMO Strategic Executive summary: In a language appealing to those outside WMO and those making decisions to fund NMHSs. and Tool/System for Monitoring & Performance Evaluation – Tracks implementation and provides for control and corrective actions for achieving the ERs.

  10. Progress Report

  11. Progress in the development of WMO SP & OP 2012-2015Consultation Process • The structure of WMO SP 2012-2015 has been based decision of EC-LXI • Every effort is made to improve the description of KOs and KPIs to facilitate assessment of performance in the achievement of results • The draft has been shared with Secretariat, RAs and TCs for inputs. • The process ensures strong linkages between SP, WMO OP, Secretariat RBB and M&E • The meeting is requested to provide any inputs and guidance to improve the SP & OP.

  12. Specific Actions for TC’s • TC’s (and RA’s) are requested to draft own Operating Plans aligned with the SP • Templates are provided as per request of the PTC • Terms of Reference and Workplans of Expert Teams should be aligned to the Strategic Plan

  13. TC Operating Plan Elements • Activities (Act.) • Deliverables (Del.) • Programme or Initiative (Prog) • Key Outcome (KO) • Expected Result (As defined in the SP) • Key performance indicator (KPI) • Key performance target (KPT) 2015 • Cost by year • Source of funding

  14. Template for Operating Plan

  15. Conclusion

  16. Summary • The contributions of RAs and TCs are essential for WMO Wide Operating Plan and Monitoring & Evaluation ; • Secretariat RBB is linked to the draft Strategic Plan • Every effort is being made to have an SP document that is succinct, long-term and truly strategic; • EC WG on SOP will meet end March to consider draft plans and documents for EC-62

  17. Thank you

More Related