An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Makerere University www.makerere.ac.ug Integrating ICT in the University functions F F Tusubirawww.fftusubira.com

  2. Contents • Motivation…the Chaos of Change • The Policy and Master Plan • The Data Network • Changing Indicators • The Data Network – Challenges • Operations – Challenges • Sustainability Challenge • Major Support Received • Master Plan II Costs • Academic Networking Opportunities • The Nascent Uganda Academic Network

  3. Motivation for ICT – The Chaos of Change • New student admission paradigm, from: exclusive to inclusive; sieving to enabling; largely academic to largely market driven; purely government to private funding • Chaos of Change: Numbers rose from about 5,000 to more than 20,000 in four years, and manual systems ground to a halt • ICT was not a fad: it was a survival need – to create efficiency and cost-effectiveness; enable research collaboration; generate the 21st century human resource.

  4. ICT Policy and Master Plan (ICTP/MP) – A journey of 1,000 miles…. • First version covered 2000-2004 period: Identified key ICT services and systems needed to ‘kick start’ the transformation at the University; (including data network) • Second version ( revision) covers 2005-2009 period: Addresses deficiencies noted in the first version; Captures the future ICT directions focusing on ubiquitous access and efficiency gains.

  5. The Data Network (1) • Four campuses: • Main campus – Makerere Hill, 300 acres • School of Medicine – 2km from Main Campus • Business School (MUBS)– 7km from Main Campus • Agricultural Research Institute (MUARIK) – 15km • First step: Rapid rollout of a wireless campus WAN (2.4Ghz) interconnecting 28 key buildings (2000). • All backbone single mode fibre; 150mm ducts laid all around campus for deployment of fibre as and when funds become available. • Backbone now running gigabit ethernet linking 56 buildings on four campuses

  6. The Data Network (2) • Layer 3 and layer 2 switches - Cisco 3550/4908 and 3512/2950; no hubs. • Design and operation based on TCP/IP network architecture; open standards ensure no lock-in to proprietary products/solutions • Network management platform developed locally using open source tools; ditto mail services • All academic and admin buildings now connected to backbone, each through a firewall on a linux machine • Interconnects: School of Medicine and MUBS via fibre backbone (leased capacity); MUARIK through leased terrestrial microwave link.

  7. The Data Network – Logical layout

  8. The Data Network - Example (3)

  9. Makerere.. Changing Indicators • Indicator 2000 2005 • ICT literate staff 300 3000 • Networked computers 300 2700 • LANS 15(Poor) 40(Good) • Backbone (Gigabit) None 16km • Bandwidth, total 192kbps 21Mbps • Active email users 300 7000 • Online journals 0 8000 • Internal ICT budget $25,000 $700,000

  10. The Data Network – Challenges (1) • Unreliable power – Have to implement expensive solutions to give key switch points 8 hours autonomy. • Limited IP space has meant use of private addresses, disabling monitoring and online support to PC level. Compounded in Makerere by getting access from two service providers (Two IP blocks) – trying to work around ICANN procedures to have own space. • Routing of internet traffic static – leading to poor bandwidth management • High cost of bandwidth: competitive sourcing from the private sector and maintaining at least two suppliers has brought current offers to $1,500 per Mbps per month – but still very expensive; Also working with consortia

  11. The Data Network – Challenges (2) • Hilly environment and old buildings – rolling out hot spots/ zones. (Also a cheaper solution). • Limited number of access points (PCs) for students (about 3,000 only) – rolling out kiosks on campus, including halls of residence; and starting implementation of a system to support staff to get their own computers.

  12. Operations – and Challenges • 16 technical staff (all levels); does not include network administrators at Faculty level or the students (about 30) who run internet kiosks: Push for high productivity • Scarcity of, and competition for competent human resource a challenge: Strategy used is to maintain an inflow by training and employing students. • Staff motivation: based largely on non-monetary benefits – especially regular opportunities for training, a level of autonomy in decision making, and a relaxed working environment • Quality of service and SLA assurance: Help Desk mode operationalised for entire unit; Automatic tracking of requests implemented; Call centre under pocurement

  13. The Sustainability Challenge • Heavy capital investment demands built in sustainability • Currently, development partner support funds 83% of capital expenditure • All recurrent expenditure (including bandwidth) is met from internal resources and direct government support • 2% of all income from private fees collection is set aside for ICT; Changing to a technology fee of $30 per student per annum, giving $1.3m per year in three years time – sufficient to meet recurrent and depreciation (replacement) costs.

  14. Major support (Phase 1)“I am because we are” • Sida / Sarec(SEK 35.3m) $3,300,000 • USAID/Leyland Initiative $800,000 • NORAD (NOK 9.5m) $1,100,000 • GoU(ADB loan) $1,000,000 • Makerere University $500,000 • NUFFIC (E-learning training) $120,000 • Carnegie Corporation $650,000 (support to main Library) • Various other partners $500,000 Total (cf projection of $11m) $8,470,000

  15. ICTP/MP II ( 2004-2009): Cost ($)

  16. Academic Networking - Opportunities • Liberal policy and regulatory environment: competition (and volume) has driven cost of bandwidth down (1Mbps per month: ~$20,000 five years ago, now a proposed $1,500); Self provision of VSATs allowed. • Policy and regulatory focus on national data backbone; private companies have already laid high capacity fibre backbone or microwave link within very easy reach of most HEIs. • Public and private universities all independent and can make quick decisions. • A formal forum of Vice Chancellors that meets regularly (now 18? members) • A regulator, National Council for Higher Education, that now requires quality and modern facilities • Increasing appreciation of mutual benefits of sharing resources – library, learning content, ICT facilities, etc.

  17. Nascent Uganda Academic Network • Initially mooted to 17 Vice-Chancellors of public and private institutions 3 years ago and approved. Activation through Academic Registrars has failed – Too many institutions that did not have commitment • 3 Vice Chancellors of universities (UCU Mukono – private; Makerere – Public; Kyambogo – Public) with access to the fibre backbone have now agreed to move ahead, starting with a few committed institutions • The ICT Directors are developing a working paper for a forum of Vice Chancellors planned for November 05 to formalise the initiative

  18. CONCLUSION • “We are what we repeatedly do. Excellence is not an event: it is a habit” - Aristotle THANK YOU