An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005

  2. Current status • The trap is currently operational. • The cage has been cleaned by Ivan and Romain • the turbo pumps have been greased by Sophie • the power supplies resources are going to be well under control (see talk of Nicolas) • - A shortcut of a trap electrode had to be fixed in the cross piece in front of the magnet • efficiencies of 30-40% have been obtained with the new CS. We should reach soon 50% • the power regulation from Mike behaves the right way. Some more tests needed • But: • The DDS module has one channel which is broken. This quite fragile module gives the voltages of the cooling excitation. Some redesign? • The control system is in its commissioning stage (cf Romain’s presentation). Some improvements to foresee? • The long standing sparking problem has to be definitely fixed • the vacuum automat still doesn’t work fully properly • the balloon won’t be connected this year • the tests for the beam preparation of this year’s beamtime have to be started

  3. Tentative schedule 1) Labview CS commissioning. February-March-April. Not 100% time consuming 2) Rotating wall cooling tests: emittance measurement. Possibly end of March / beginning of April - 1 week 3) Change of buffer gas: Ar cooling. 2 days mid April 4) Change of buffer gas: tests with He. 3 days mid April 5) Tests with Li from REXTRAP ion source, light ions cooling. One week in May 6) May  October: REX operation according to the ISOLDE schedule 7) Mass resolving power tests: some tests between July – August (summer student time) Some preliminary tests in May could be foreseen. And the WITCH tests that could be done in autonomy

  4. Future developments • Mass resolving power of the trap • Tests needed. Implementation of a new excitation scheme – 6/9 months of a PhD • Conclusions on the rotating wall cooling tests. Still some emittances to be measured • 1 month of a PhD – article? • Development of the molecular beam breakup techniques – 2/4 months. A collaboration with theoreticians could be helpful • Improving the typical efficiency of the trap. Quite careful studies (5-10 months) by simulation and tests for • -lowering the magnetic mirror effects • Implementing a more efficient cooling excitation • New differential pumping scheme at the trap. 1/3 months. More efficient trapping scheme. Use of He as a buffer gas. • Beam diagnostics improvements. Beam identification after the trap - 3 months.

  5. REXTRAP R&D: The manpower issue • Several tracks are pursued • Modification of the current position of Romain  PhD? • Doctorate students program at CERN/ Marie Curie applications • One application to the Austrian program