An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LUSD Cellular Tower AgreementPhotovoltaic Project Update Board Meeting March 26,2013 Prepared By: Mr. Tim Hern Mr. Warren Sun

  2. LUSD Cellular Tower Agreement

  3. 1 st Year Savings Photovoltaic ProgramDescriptionTotalOngoing Savings Electrical Savings $520,886 Cal Solar Incentive $405,551Total Annual Savings $926,437Ongoing Cost Lease Payment $716,508O&M $22,900Total Annual Cost $739,408Net Savings $187,029Estimated JAESC $33,685Total Net Savings $220,714

  4. Conclusion • The actual savings have exceeded our estimations. • Therefore, the project calculations made by Strategic • Energy Consulting (SEC), were moderate and • conservative.

  5. Appendix A LUSD Photovoltaic Savings Analysis

  6. Appendix B 1st Year Savings Comparison