Process for Updating Measures with RBSA Data

Process for Updating Measures with RBSA Data. Regional Technical Forum January 23, 2013. Background. RTF 2013 Workplan has the following line item: “Update workbooks with new RBSA data” Availability of RBSA Data Single Family: available now Manufactured Home: very soon

aggie
Download Presentation

Process for Updating Measures with RBSA Data

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process for Updating Measures with RBSA Data Regional Technical Forum January 23, 2013

  2. Background • RTF 2013 Workplan has the following line item: • “Update workbooks with new RBSA data” • Availability of RBSA Data • Single Family: available now • Manufactured Home: very soon • Multifamily: later in spring • Submetering: summer? • The RBSA data allow for a big improvement in RTF work products • Savings will likely change; costs could, too • Issue: Meeting agenda time for 2013 • Reviewing full presentations for each measure would eat up a lot of agenda time, which may be unnecessary considering the quality and usefulness of RBSA data

  3. Staff Proposal For measures with Active status that will not sunset in 2013, the following process will be followed: • Staff performs measure update behind the scenes; updates measure workbook to website • At the next RTF meeting, staff makes a short presentation of “previous” and “updated” values for Savings, Cost, and Cost-effectiveness (in Staff Updates). • Unless there is objection at the presentation, the RTF will have approved the changes by “Consent Decision” • If there is objection, the measure will revert to having a full presentation by staff at a subsequent meeting Exception: Staff would bring full presentations to the RTF where data are more “artistically” manipulated or where staff is otherwise uncomfortable with the data, calculations, or results. Note: Staff plans to make a full presentation of updates for non-Active measures and measures that sunset in 2013.

  4. Examples of Uses of RBSA Data • Storage rate for CFL’s • Weightings • Foundation type • House size • Fuel & heating system types • Water heater locations & tank sizes • Baseline duct leakage • Baseline Lighting Wattage and Lamp/Room Distribution

  5. Residential, Active, and Not Sun-setting in 2013

  6. Decision • Accept staff’s proposal?

More Related