1 / 7

Jefferson Lab Site Report

Explore Jefferson Lab's latest computing projects, cybersecurity measures, & upgrades, including infrastructure enhancements & data storage solutions.

aguilare
Download Presentation

Jefferson Lab Site Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jefferson LabSite Report Sandy Philpott Thomas Jefferson National Accelerator Facility 12000 Jefferson Ave. Newport News, Virginia USA 23606 Sandy.Philpott@jlab.org 757-269-7152 http://cc.jlab.org Fall 2006 HEPiX – JLab

  2. Topics • JLab news • Computing news • DoE Site Assistance Visit • Computing Projects

  3. JLab News • 12GeV Accelerator Upgrade project with new Experimental Hall anticipates DoE Critical Decision-2 approval Spring ’07 Significant funding becomes available Significant increase in computing requirements • New Information Technology Division Scientific Computing – merge Lattice QCD and Physics data processing efforts; DAQ remains in Physics Division Computing and Networking Infrastructure – most of former Physics Computer Center Management Information Systems–business computing Electronic Media – including web services, Library

  4. Computing News • WAN connection upgraded to OC-192 • 10 gigabit to E-LITE • Connects to the NLR – National Lambda Rail • US DoE Site Assurance Visit • RHEL4 64bit computing … wait for RHEL5? • Glue-X Collaboration proposal includes OSG infrastructure for data analysis • New $1.5M Lattice QCD cluster anticipated Spring07

  5. DoE Site Assistance Visit • CybSec personnel and resource numbers • Patch Management, Vulnerability Scanning, Configuration Management • Publicly available systems / visitor network • Wireless inside JLab’s network (WPA, remove WEP) • Network segmentation, Enclave structure • Personally owned devices – protect; control configuration • Audit logs, parsing • Session lock and login attempts • Data center physical security • Inventory control • User culture

  6. Computing Projects • Two factor authentication • Network segmentation/Enclaving • Infiniband switching fabric • Cisco IOS-like management? • Fabric for Storage? • Mass storage system upgrades • JASMine enhancement - common API for diverse clients, including experiment halls, batch farm, parallel cluster, Storage Resource Manager, user command line • Silo capacity and throughput increases • 100+MB/sec DAQ systems; 10sPB data storage • OSG installation • Has been on hold due to lack of resources • Revisit and reopen this project • LQCD cluster procurement and installation • 10GigE data path • Scientific Computing integration • OSs, schedulers, etc.

  7. Long Range Balance of fulfilling the computing requirements for the science program with meeting the cybersecurity requirements of a U.S. national lab.

More Related