Information-Technology RTF Sub-Committee July 2 , 2013

Information-Technology RTF Sub-Committee July 2 , 2013. Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency . Meeting Topics. IT Sub-Committee Overview ( Mira) DRAFT Measure Survey (Mira) Data Center Dashboards (Ted with SCL)

ahanu
Download Presentation

Information-Technology RTF Sub-Committee July 2 , 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information-Technology RTF Sub-CommitteeJuly 2, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

  2. Meeting Topics • IT Sub-Committee Overview (Mira) • DRAFT Measure Survey (Mira) • Data Center Dashboards (Ted with SCL) • Silicon Valley Data Center Energy Summit summary (Mary) • NEEA Data Center update (Geoff)

  3. IT Sub-Committee • Sub-Committee of the Regional Technical Forum (RTF) • 2. Purpose: develop and recommend data center measures with • high consensus methodology to estimate and verify electrical savings • specification for cost effective installations that ensures persistent savings • Minutes and presentations are posted at: http://rtf.nwcouncil.org/subcommittees/it/meetings.htm

  4. IT Sub-Committee DRAFT Work Plan • Goal: to develop and recommend Information Technology (IT) measures to the Regional Technical Forum (RTF). • Proposed first steps: • Prioritize measure focus, • Review baseline studies and • Review other research.

  5. Data Center Characterization Survey

  6. Data Center Characterization Survey

  7. Data Center Characterization Survey

  8. Data Center Characterization Survey

  9. Measure Survey Approximately how many data center project incentives have you provided?

  10. Measure Survey Approximately how many data center project incentives have you provided?

  11. Measure Survey

  12. Data Center Dashboards • Ted Brown with Seattle City Light

  13. Silicon Valley Data Center Energy Summit • Mary McEnroe with Silicon Valley Power

  14. NEEA Data Center Update • Geoff Wickes with NEEA

  15. Next Meeting: 8/6/13 at 1:30 pm • Potential topics: • NEEA Data Center updates (Geoff) • ETO Data Center Baseline Study • Other topics (all)

  16. NEEA Data Center Market Study • Geoff Wickes