An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Variable Capacity Heat Pump RTF Sub-CommitteeJune 27, 2012 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

  2. Meeting Agenda • VC HP Sub-Committee Overview (Mira) • EnergyPlus VRF Overview (Richard Raustad, FSEC) • Building Simulation Program Issues • If we have time: • BPA VRF System Emerging Technology Field Test • Whole Building M&V Approach

  3. EnergyPlus VRF Overview • Richard Raustad, Senior Research Engineer • Florida Solar Energy Center

  4. Building Simulation Program Issues • How accurate are building simulation programs for estimating site-specific savings? • How will the accuracy of the building simulation programs be verified? • Certify building simulation programs? • Develop VRF calibrated modeling best practices? • Other?

  5. 30-ton VRF System Before & After Energy Use BEFORE AFTER

  6. Next Meeting: 8/22/12 at 9 am (no July meeting) • Potential Topics: • Compile list of PNW VRF installations & brainstorm how to “mine” for useful information • Develop M&V best practice and standard protocol • Develop research plan to verify model accuracy • Compare actual RTU annual fan kWh/SF to models • Develop VRF savings estimates (IEER plus fan?) • NEEA RTU Replacement Discussion