1 / 15

Information-Technology RTF Sub-Committee May 7 , 2013

Information-Technology RTF Sub-Committee May 7 , 2013. Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency. Meeting Topics. IT Sub-Committee Overview (Mira ) Green Grid Forum Summary (Corban Lester) Market segmentation overview (PECI)

Download Presentation

Information-Technology RTF Sub-Committee May 7 , 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information-Technology RTF Sub-CommitteeMay 7, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

  2. Meeting Topics • IT Sub-Committee Overview (Mira) • Green Grid Forum Summary (Corban Lester) • Market segmentation overview (PECI) • NEEA’s Data Center Market Study (Geoff) • Plus if time allows: • DRAFT Measure Survey (Mira) • IT Research Projects(all) • Topic suggestions for future meetings (all)

  3. IT Sub-Committee • Sub-Committee of the Regional Technical Forum (RTF) • 2. Purpose: develop and recommend data center measures with • high consensus methodology to estimate and verify electrical savings • specification for cost effective installations that ensures persistent savings • Minutes and presentations are posted at: http://rtf.nwcouncil.org/subcommittees/it/meetings.htm

  4. IT Sub-Committee DRAFT Work Plan • Goal: to develop and recommend Information Technology (IT) measures to the Regional Technical Forum (RTF). • Proposed first steps: • Prioritize measure focus, • Review baseline studies and • Review other research.

  5. Green Grid Forum Summary Corban Lester Program Development Manager, Lockheed Martin Chairman, Utility Task Force, The Green Grid

  6. Market Segmentation Overview • Scott Schuetz • PECI CIO

  7. NEEA Data Center Market Study • Geoff Wickes

  8. Next Meeting: 6/4/13 at 1:30 pm • Potential topics: • ETO Data Center Baseline Study • IT Research Projects(all) • Topic suggestions for future meetings (all)

  9. Data Center Characterization Survey

  10. Data Center Characterization Survey

  11. Data Center Characterization Survey

  12. Data Center Characterization Survey

  13. Measure Survey

  14. Measure Survey

  15. Measure Survey

More Related