1 / 6

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-SG Closing Report for Waikoloa, Hawaii September 2010 Date Submitted: September 2010 Source: David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless

ahava
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:LECIM-SG Closing Report for Waikoloa, Hawaii September 2010 Date Submitted: September 2010 Source:David Howard, On Ramp Wireless Contact: David Howard, On Ramp Wireless Voice: +1 (858)592-6008 x221 , E-Mail: david.a.howard@ieee.org Re:LECIM Closing Report for September 2010 Session Abstract: LECIM Closing Report for Waikoloa, Hawaii Purpose: Information to 802.15 WG Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 David Howard, On Ramp Wireless

  2. Low Energy Critical Infrastructure Monitoring Monday AM2: • Appointed Betty Zhao (Huawei), Secretary • Appointed James Gilb, acting editor • Discussed PAR & 5C procedure • Reviewed wng, and tutorial presentations • Reviewed the application and technical requirements • WG chair gave tutorial on difference between amendment and standard David Howard, On Ramp Wireless

  3. Low Energy Critical Infrastructure Monitoring Wednesday AM1: • Draft PAR discussion, review and editing. • Straw poll to determine amendment or standard path. Amendment was decided. Thursday AM2: draft PAR and 5c discussion, review and editing. And ….. David Howard, On Ramp Wireless

  4. LECIM SG • SG Motion: Move that the Low Energy Critical Infrastructure Monitoring Study Group requests that the 802.15 WG forward the LECIM draft PAR (doc number: 15-10-0756-04) and LECIM draft 5C (doc number: 15-10-0757-02) to the 802 EC for approval to forward the LECIM PAR request to NesCom. • Moved: Steve Jillings (Semtech), Seconded: Shuzo Kato (NICT) • Upon no discussion the vote was taken with the results of 17 approve, 0 oppose, and 1 abstaining; motion carries. David Howard, On Ramp Wireless

  5. LECIM SG The three sessions were attended by more than 26 individuals, representing more than 18 organizations. SG LECIM Draft PAR: doc: IEEE 802.15-10-0756-04-leci SG LECIM Draft 5C: doc: IEEE 802.15-10-0757-02-leci David Howard, On Ramp Wireless

  6. LECIM SG • WG Motion: request that the PAR and Five Criteria contained in documents 15-10-0756-04 and 15-10-0757-02 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval. • Moved by: David Howard (On-Ramp Wireless, Inc.) • Seconded by: • Results: ?? Approve, ?? Oppose, ?? Abstain David Howard, On Ramp Wireless

More Related