NGAO Meeting #3Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006
Welcome - Participants • Telecon Attendees: • NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich • Sean Adkins, Brian Bauman, Antonin Bouchez, Ralf Flicker, Erik Johansson, Mike Liu, Franck Marchis, David Le Mignant, Anna Moore(?), Chris Neyman, Viswa Velur
Goals of Today’s Meeting • Review Progress (management, science, performance budget & instrument updates) • Review trade study reports
Meeting Agenda (PST times)http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3 09:50 Welcome (& connections) 10:00 Management Report (Wizinowich) 10:25 Science Team Report (Max) 10:45 Systems Engineering Report (Dekany) 11:10 Trade Study Report: MOAO vs MCAO (Gavel) 11:40 TS Report: Rayleigh Rejection Strategies (Velur) 12:00 TS Report: Stand-alone vs DM on T/T (Bauman) 12:20 Break 12:40 Instrument Trade Studies Update (Adkins) 13:00 Upcoming tasks & milestones (Wizinowich) 13:20 Discussion: Issues pertaining to ongoing & upcoming work 14:30 Adjourn
NGAO System Design PhaseManagement Report NGAO Meeting #3 Peter Wizinowich December 13, 2006
Presentation Sequence • System Design (SD) Phase SEMP Approval Status • SD Phase Tracking • Meeting Tracking • Meeting action items status • EC meeting minutes • Work scope planning sheets status • Posted documents
System Design Phase Approval Status • SEMP submitted to the Observatory Directors on 9/29/06 for approval • Official response not yet received (has been requested) • Major issue is how many $ can be made available in FY07 • Direction from WMKO management to proceed while decision is being made • Statements of work complete for COO & UCO & purchase requisitions about to be issued with limited initial funding
System Design Phase Tracking • Tracked (Excel) version of the plan posted at http://www.oir.caltech.edu/twiki_oir/pub/Keck/NGAO/SystemDesignPhasePlanning/NGAO_SD_schedule_v20_tracked.xls • Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets.
Meeting Tracking • The tracked version of the action items from meeting 2 are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061114_CIT_NGAO_Meeting_2 • The minutes & action items from the EC meetings are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning
Work Scope Planning & Approval • Simplified template posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/NGAOTemplates • To be prepared by WBS element lead & approved prior to performing significant work on a WBS element • Approvals & document control by WBSx.x lead & Wizinowich • We will endeavor to provide approvals within 5 working days of submittal • List of all WBS elements requiring a scope planning sheet can be found at: http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/WorkProducts • Table also provides a location for posting the planning sheets & deliverables • Draft planning sheets posted for many items (includes WBS number, name, dictionary definition & effort estimate from SEMP) • Planning sheet status • Posted for WBS 2.2, 3.1.1.1.1 & 3.1.1.5 • Approved for WBS 3.1.2.1.1, 3.1.2.2.13 & 3.1.2.3.3. • REMINDER to fill out these planning sheets!
Posted Documents • KAON 415 TMT site monitoring data (restricted access) • KAON 416 Atmospheric sodium density from Keck LGS photometry • KAON 417 Sodium abundance data from MAUI Mesosphere • KAON 427 Variable vs fixed LGS asterism • KAON 429 LGS asterism geometry & size • MOAO vs MCAO trade study report
NGAO System Design PhaseUpcoming Tasks & Milestones NGAO Meeting #3 Peter Wizinowich December 13, 2006
Upcoming Meetings & Milestones • Meeting #4 is Jan. 22 at Keck HQ • http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070122_NGAO_Meeting_4 • Will need % complete for WBS elements prior to meeting (also to be used for SSC report) • SSC meeting Jan. 24 at Keck HQ • 1st project report to SSC & Observatory management • Will need a good estimate of project completion versus costs to date • Milestones: • SEMP approval was due 10/9 (verbal ok only) • SD phase contracts in place was due 10/27 • Science requirements summary v1.0 was due 10/27 • System requirements document v1.0 was due 12/8 We need to show all of these milestones as complete at SSC meeting!