1 / 11

Science Operations Update NGAO - Meeting 11

Science Operations Update NGAO - Meeting 11. D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007. Talking Points. Update to the picture Science cases update The path to release 2 of SCRD SRD update version 1.15 available for comments Science Ops WSPS

kim-sherman
Download Presentation

Science Operations Update NGAO - Meeting 11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Science Operations UpdateNGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007

  2. Talking Points • Update to the picture • Science cases update • The path to release 2 of SCRD • SRD update • version 1.15 available for comments • Science Ops WSPS • The on-going: Pre-observing interfaces: • The guide star tool • The equivocal • Discussion / comments

  3. System Design Approach System Engineering Science Operations Performance budget Trade Studies 3.4: Science Ops Functional Rqts Observing Efficiency Budget Observing Models TS: KAON 476 Main Drivers & Risk Areas • WSPSs • Pre-observing interfaces Observing Timeline Rationales for Functional and Performance Requirements SRD v1.15 Observatory Rqts Science Operations Observing Scenarios SCRD v. 2 progress status Science Requirements

  4. Priorities from last meeting (09/17) • SCRD • Include/retrofit observing scenarios • “All-in” science simulations for SCRD • E.g., Requirements for PSF reconstruction • SRD from the operations perspective • Science ops requirements • Based on ?? • Observatory overall requirements • Based on ?? • Observing efficiency performance budget • See Science Ops page • NGS backup science TS? • FRD for science operations • WBS 3.1.3.3.6 • Science operations plan • WBS 3.4 • WBS 3.2

  5. Science Cases Update • Claire, Liz and David produced a completion status table for the science cases (Key science drivers and science drivers): • Linked here • Rationale: • Manage the simulations and edits for each science case • Case / case -> small team for each science case • Expected outcome: release 2 of SCRD • For each science case • Status of SCRD & SRD tables and text • Status of observing scenarios • Status of simulation (AO and science) and new requirements • Need to identify SC Volunteers (we don’t pay them!) • What’s next: • Find and work with the volunteers case by case. (twice a month meetings, etc) • Time/effort allocation? • Process already started for Asteroids (KSD #1)

  6. SRD v1.15 • Included changes up to 1.14 • Changes to section 6.1 and 6.2, then posted on the NGAO TWiki pages: linked here • Included science operations in section 6.1.4, • Requirement summary tables 19-21 • Updated section 6.2 Observatory Requirements • Added (moved) telescope and dome environment requirements • Added Observatory Operational requirements • Any volunteer to review the changes and iterate?

  7. On-going WSPS • Science operations: the on-going • WBS 3.4.1.1: Pre-observing interfaces • AO Guide Star Interfaces • Science Observations Simulation Tools • Soon to start: • WBS 3.4.1.2: Observing interfaces • Acquisition • Observing Sequences • Instrument, AO & Telescope Observer Interfaces • Science Data Quality Monitoring • TBD: FRD for science operations • WBS 3.1.3.3.6

  8. AO Guide Star Interfaces

  9. Science Observations Simulation tools • Requirements on Simulation Tools have to be defined and include similar challenges than for PSF reconstruction: • How to measure the quality of simulations • SR, EE, FWHM of peak and halo • PSF radial fit • Speckle intensity and distribution • Deconvolution residuals • ? • What is the experience of GPI and others • Coordination of the effort with the IWG • How much can anticipate an instrument interface design? • Requirements?

  10. 3.4.2.1 Operations Architecture • Click here • WSPS not agree and equivocal • TBD coordination work with 3.2 3.4.2.2 Operations Optimization • Click here • WSPS not agree and equivocal • TBD coordination work with 3.2

  11. Discussion / Comments • Priority list • More effort on SCRD/SRD than FRD for operations • Pre-observing Interfaces on-going • Observing timeline / observing scenarios • Operations Architecture.. (not before December) • Iterations between science requirements and system design. • Our plan includes iterations between the SCRD and the AO system design. • Simultaneously with completing SCRD v2.0, we need to be working with Rich to refine his spreadsheet calculations of the relevant wavefront errors; with Chris and scientists to simulate the relevant AO performance for analysis by the scientists; then use simulations to translate science requirements to AO system requirements. • We hadn't expected SCRD v. 2.0 to take as long as it has taken. • Requirements tables from SRD were a very useful approach, and have clarified what are the key questions that need further work. • Some of these have been addressed, others are in progress • Hard to get senior scientists to do substantive work; younger generation has been more useful. • SCRD v. 2.0 completion status will be posted and updated. • Any questions?

More Related