An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Seal Cove AreaAlternate Route Options Department of Public Works June 17, 2008

  2. History • In December 2007, survey sent to property owners in Seal Cove Area to determine interest in constructing alternate routes, funded through assessment district, if Ocean Blvd. becomes permanently impassable. • County received very limited support for an assessment district. • Only 26.4% of property owners responded to survey, possibly due to uncertainty if Ocean Blvd. would be reopened.

  3. Limits of Survey / Assessment District Boundary

  4. Survey Results • Option 1 – Of the 26.4% who returned the survey, 1.9% voted for this option.

  5. Survey Results • Option 2 – Of the 26.4% who returned the survey, 3.8% voted for this option.

  6. Survey Results • Option 3 – Of the 26.4% who returned the survey, 1.1% voted for this option.

  7. Survey Results • Option 4 – Of the 26.4% who returned the survey, 0.4% voted for this option.

  8. Survey Results • Option 5 – Of the 26.4% who returned the survey, 2.3% voted for this option.

  9. Survey Results Option 6 – No road improvements. • Of the 26.4% who returned the survey, 16.9% voted for this option.

  10. Estimated Assessment District Cost Analysis • Total cost includes Engineering, Construction Inspection, Administrative, and Contingency costs. • Options #3-5 will require retaining walls which significantly increase cost of construction.

  11. Frequently Asked Questions

  12. How are road maintenance projects financed? • Not funded by property tax • Are funded primarily by gas tax

  13. Why would we be assessed for the road improvements? Will the County pay for the road improvements? • Precedence set that roads are only put in by developers or adjacent property owners. • County’s policy states that County Road Funds (funded by gas tax) only maintain roads that are in the County-maintained road system. • All of proposed alternative routes are not within the County-maintained road system.

  14. (Continued) Why would we be assessed for the road improvements? Will the County pay for the road improvements? • Any improvements to non-County maintained roads must be financed by property owners / developer before County accepts for maintenance.

  15. How would the assessment district work? • An assessment district is only formed if majority of weighted assessments returned approves the district. • One simple way to spread assessments is where the assessment amount is based on total project cost divided by the number of parcels within the district. • Final Assessments based on cost prices at the establishment of the Assessment District. These numbers presented now are only estimates.

  16. How does a road become accepted into County-maintained road system? • Property owners submit a petition, representing vast majority of road frontage for affected project area. • At least 50% of road frontage for proposed roads is developed with main building.

  17. (Continued) How does a road become accepted in the County-maintained road system? • Length of the proposed road shall be one or more entire blocks. • Existing road shall be min. 16-foot wide gravel/oil or asphalt paved travel way and one-foot wide shoulders on each side, with drainage swales or channels. • County recommends asphalt with road base (longevity and more sturdy).

  18. Next Steps • If community shows further interest, appoint members to a representative group to work with County. • Group provides County with answers to most feasible route, size of boundary, etc.

  19. Questions…? Thank you!