1 / 5

AoH Conference Call August 10, 2004

AoH Conference Call August 10, 2004. Air Resource Specialists, Inc. First Step: Emissions Inventory Data Review. Review of EIs prepared for WRAP and assembled by various forums: Point and area sources (Pechan & Associates) Mobile sources and road dust (Environ) Fire sources (Air Sciences)

aine
Download Presentation

AoH Conference Call August 10, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AoH Conference CallAugust 10, 2004 Air Resource Specialists, Inc.

  2. First Step:Emissions Inventory Data Review • Review of EIs prepared for WRAP and assembled by various forums: • Point and area sources (Pechan & Associates) • Mobile sources and road dust (Environ) • Fire sources (Air Sciences) • Biogenics and wind blown dust (RMC) • Initial reviews scheduled with Tom Moore in coming weeks

  3. Summaries for Final 2002 EI • Methods, assumptions and uncertainties • Discussion of strengths and weaknesses of methods • How do EI results affect modeling efforts and vice versa? • Diagrams, charts, tables, etc. for clear presentation of source types and locations

  4. AoH Web Site • Will be accessible to AoH by next call (8/24): • Basic links (WRAP, COHA, RMC sites) • Existing documents (RFP, ARS proposal, presentations, minutes, schedules/agendas) • Draft EI products for discussion on 8/24 • Limitations: • Developed in accordance with WRAP Webmaster requirements • Simple, functional structure for ease of use • ARS cannot guarantee 24/7 access, and will notify workgroup chairs of maintenance downtimes or unexpected problems • Should the site be password protected?

  5. Timeline

More Related