An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RACT Element March 20, 2006 St. Louis Ozone & PM2.5 Joint Workgroup Meeting John Rustige, P.E. Air Pollution Control Program

  2. Ozone Implementation Schedule

  3. Phase II Requirements • RACT determinations for individual sources must be made. • RACT element due September 15, 2006 • RACT must be implemented by May 1, 2009 • States can rely on existing RACT guidance, but preamble notes EPA intends to develop additional guidance which states must consider if developed.

  4. Phase II Requirements • Sources subject to NOx SIP call & CAIR will be presumed to meet RACT, so no analysis is required for these sources • State also required to provide implementation of Reasonably Available Control Measures • Rule expects consultation between states and power sector - (CAIR) workgroup

  5. RACT Actions • Staff plans to conduct Review of Existing RACT Rules • Generic VOC & NOx RACT currently exist in Missouri • Consultation with EPA

  6. RFP Element March 20, 2006 St. Louis Ozone & PM2.5 Joint Workgroup Meeting John Rustige, P.E. Air Pollution Control Program

  7. Final demonstration • We will need to confirm our calculations with EPA •  (2002-2008)  RFP + I/M backslide • Anti-backsliding should be based on comparisons in 2008 ? (through 2014 - end of maintenance period?), not old 1-hour dates??

  8. RACT & RFP Questions March 20, 2006 St. Louis Ozone & PM2.5 Joint Workgroup Meeting John Rustige, P.E. Air Pollution Control Program