1 / 11

HBD HV Control and Monitoring System

HBD HV Control and Monitoring System. A Gain vs. HV study throughout Run-9 – PART 2 –. Manuel Proissl HBD Meeting 06/23/2009. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd , 2009.

akerry
Download Presentation

HBD HV Control and Monitoring System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HBD HV Controland Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009

  2. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 GENERAL NOTES • Entire gain and HV data from Run-9 has been processed and is written to the <mod>gain tables in hvdb for future reference. • Several (first) sections of this data have been analyzed and are presented below. • Although gain fluctuations are studied based on parameters we’re aware of having direct effect on the gain, incl. • P/T measurement and • Applied GEM voltage; • a solid overall conclusion of its real behavior cannot be given at this point, as the following results indicate. HBD HV Control & Monitoring System Manuel Proissl Page 2 of 11

  3. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 NO HV CHANGE :: CHANGE IN GAIN • Gain increases by ~ 50% • During a PHYSICS running “downtime” of 4 hours, the detector was at Standby. HV activity while no PHYSICS running 3980V 2500V HBD HV Control & Monitoring System Manuel Proissl Page 3 of 11

  4. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 NO HV CHANGE :: CHANGE IN GAIN • During the entire inspected runtime, the P/T varied by 0.25% and stayed within its bin: • 2.52892 - 2.555846 Torr /K • During a PHYSICS running “downtime” of 4 hours, the detector was at Standby. •  Gain changed even though no change in voltage nor acceptable P/T within ±10% window. RUNS PROCESSED: 288007 - 288069 WITHIN P/T BIN: T1 HBD HV Control & Monitoring System Manuel Proissl Page 4 of 11

  5. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 HV CHANGE :: CHANGE IN GAIN • Gain increases by ~ 96% • During a PHYSICS running “downtime” of 2 hours, the detector was brought to Standby and then ‘Quad-tripped’ before the SA1 recovered it to a new P/T HV setting… the gain jump appears. QUAD-TRIP HBD HV Control & Monitoring System Manuel Proissl Page 5 of 11

  6. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 HV CHANGE :: CHANGE IN GAIN • Gain increases by ~ 22% • During a PHYSICS running “downtime” of 2 hours, the detector was brought to Standby. STANDBY HBD HV Control & Monitoring System Manuel Proissl Page 6 of 11

  7. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 HV CHANGE :: CHANGE IN GAIN • During the ENTIRE runtime, P/T has been rising (~ 1%) without any change in gain until it passed the boundary, which is when we adjusted the voltage… • The software did what it was supposed to do! • However, the idea is to keep the gain STABLE by adjusting the HV if the gain raises or falls respectively! RUNS PROCESSED: 288835 - 288900 HV CHANGE T2 T1/T2 BOUNDARY 2.555846 Torr/K T1 HBD HV Control & Monitoring System Manuel Proissl Page 7 of 11

  8. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 HV CHANGE :: “NO” CHANGE IN GAIN • Before IR Access on June 10th and after, the gain did not change, although the HV has been changed to the next P/T HV bin. shown above IR ACCESS HBD HV Control & Monitoring System Manuel Proissl Page 8 of 11

  9. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 HV CHANGE :: “NO” CHANGE IN GAIN • The P/T was changing quite a lot as well as the HV after the access. • Nevertheless, the gain remained constant. RUNS PROCESSED: 288094 - 288900 IR ACCESS T3 CONFIG CHANGE APPLY HV CHANGE T2 shown above GAS MIXING HOUSE PROBLEM T1 HBD HV Control & Monitoring System Manuel Proissl Page 9 of 11

  10. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 GAIN STABILITY FOR ALL 200GeV runs • One module from the East and West is plotted for the two most activate P/T sets throughout the entire 200 GeV run. Only Physics runs without virtual or hardware trips in ES3 or WN5 have been chosen. • Overall stability of the gain can be seen for each individual set. HBD HV Control & Monitoring System Manuel Proissl Page 10 of 11

  11. Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23rd, 2009 Entire P/T Variation for Run-9 • A large fraction of the 500 GeV data shows lower P/T, corresponding to March 15th to April 13th.  mostly T1 & T2 bin activity. • Unlike the overall 200 GeV run, showing several high peaks with a primary bin range of T2 to T3. 500 GeV 200 GeV HBD HV Control & Monitoring System Manuel Proissl Page 11 of 11

More Related