100 likes | 208 Views
HV Control box. HV Box from Athens. Kai Schweda, University of Heidelberg. P. Mantzaridis, A. Markouizos , P. Mitseas, M. Petridis , A. Petridis , S. Potirakis , M. Tsilis, M. Vassiliou T. Dietel, D. Emschermann, J. Mercado, K. Oyama, M. Stockmeier.
E N D
HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas, M. Petridis, A. Petridis, S. Potirakis, M. Tsilis, M. VassiliouT. Dietel, D. Emschermann, J. Mercado, K. Oyama, M. Stockmeier
Anode Voltage Distribution System(6-ch. Card / Top View and Auxiliary Power Supply Box)
Summary Visit at KIP (Feb 23 - 25)- Positive Voltages (2000 V) 6 channels successfully tested- Full Command access through CAN (and serial interface)- First PVSS FSM functions + error handling available To do - Provide negative voltages (-3000 V), 1st prototype end of April- Software regulation w/ 16 bit ADC @10-15Hz ~5mVGoal- Full test of 1st SM equipment at HD/KIP (end of May)
TRD DCS - Status Kai Schweda, University of Heidelberg R. Bramm, T. Dietel, M. Kessenbrock, C. Lippmann, J. Mercado, K. Oyama, B. Schockert, M. Stockmeier
J. Mercado, G. Tsiledakis FED Server B. Schockert M. Kessenbrock, K. Oyama T. Dietel, R. Bramm InterCom Layer FEE Client V. AngelovC. LippmannJ. MercadoK. OyamaK.S.M. Stockmeier FEE Server FEE Server FEE Server 3-Layer Architecture PVSS (DIM - Client) #1 User: 1 PVSS FinalState #2 Intermediate: 1 InterCom + DB #3 540 DCS boards 8(6) ROBs each: ControlEngine / FeeServer Config. DB CommandCoder
Monitoring Configuration: 65k*30kBytes, 1/run Number of time bins: 1 parameter, 1/run Clock frequency: 65k, 1/run Dead-channels: during run/data stream ? ADC-thresholds: 65k, 1/run MCM-temperatures: 65k/<N>, > 1/min Gas-temperatures: 4*30*18 channels > 1/min HV: 18*6*4, > 1/min Q: What DataBase(s) to use ?
Summary ControlEngine/FeeServer- functions (check scsn + readout-tree; config, monitor) implemented DataBase, InterComLayer: ready to use Command-Coder: available next 4 weeks PVSS FSM: just started Goal- Full test on ~200 DCS boards (TPC) at CERN (end of May)- Hand-dover to dcs/CERN: end of June 2006 Q: Code maintenance at CERN 24/7 by TRD expertsQ: DataBase update at CERN 24/7 by TRD experts