1 / 23

An overview of the EU ETS

An overview of the EU ETS. Market design and Phase 1 Lesson learned and the economic literature on EU ETS price drivers Entering into Phase 2 of the EU ETS: what is new ? Main compliance results from 2008 The European Commission’s proposal for Phase 3: changing the rules.

akio
Download Presentation

An overview of the EU ETS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An overview of the EU ETS • Market design and Phase 1 • Lesson learned and the economic literature on EU ETS price drivers • Entering into Phase 2 of the EU ETS: what is new ? • Main compliance results from 2008 • The European Commission’s proposal for Phase 3: changing the rules

  2. EU ETS installations’ timeline Beginning of Year N of the EU ETS End ofYear N of the EU ETS Publication of Year N-1 emissions by the EC Double-allocation period 15 May 30 Apr. 31 Dec. 1st Jan. 28 Feb. 30 Mar. Year Nallocation on installations’ accounts in their national registry Installations surrender the allowances covering their Year N-1 emissions in the national registry Installations submit their verified emissions forYear N-1 to the national authority

  3. The EU ETS: A tool to cap EU CO2 emissions • EU ETS Directive in 2003 when no KP ratification • 2 compliance periods (now 3) • 25 then 27 MS with different economic and social backgrounds • Referee: the European Commission European 3x20 Objectives Dec: End ofEU ETS phase II 1 Jan: Beginning ofEU ETS phase II 1 Jan: Beginning of EU ETS phase I 2012 2013 2007 2020 2005 2008 Dec: End of first Kyoto Protocol period 1 Jan: Beginning of first Kyoto Protocol period Feb: Kyoto Protocol comes into force

  4. A successful start for the market in Phase 1… • Installations may be « short » or « long » Phase I Allocations minus Emissions (Mt CO2) • Can buy or sell allowances on a financial market • Trades through exchanges or Over-The-Counter agreements • Compliance and financial markets Minimum exchanges on the market: 650 Mt « Long » Installations « Short » Installations Source: Mission Climat from CITL.

  5. … with the emergence of a reliable carbon price • Sharp growth in traded volumes: 262 Mt (2005)  1,454 Mt (2009 Q1 + Q2)  3,505 Mt • EUA December 2009: €13.10 / EUA December 2012: €14.66 Source: ECX, BlueNext, Reuters

  6. Lessons learned from Phase I • Convery (2009) • Convery, Ellerman, de Perthuis (2009) • Ellermann and Joskow (2008) • The pilot phase was useful, despite the shortcomings (such as the structural break in 2006 after the emission verification; vintage effect due to banking restrictions). • Carbon now has a (real) price. • Carbon price has induced “some” emissions abatement, in the form ofintra-fuel substitution (brown to hard coal) in Germany and improved CO2 efficiency in the UK. • Carbon price has had a limited impact on industrial competitiveness. • The European carbon market has had external impacts linking different carbon markets.

  7. Price drivers in the CO2 market: where do we stand? • Theoretical contributions: • institutional factors: tightness of national targets, market liquidity, link with Kyoto flexible mechanisms, banking-borrowing; uncertainties about future regulations. • market structure; macroeconomic factors: GDP level and economic growth; microeconomic factors: fuel prices, energy substitutability possibilities and the costs of abatement efforts/technologies, sectors' characteristics. • exogenous factors: climate variables. • Empirical contributions: • market structure, climate, institutions (Alberola et al. 2008, Mansanet et al 2007, among others); • volatility models - financial approach (Daskalakis et al. 2007, Paolella et al. 2007, Seifert et al. 2008).

  8. Summary of carbon price determinants

  9. EU ETS Phase II: extension of the coverage and reduction in allocations • Phase 2 encompasses: • The inclusion of new sectors and gases: • opt-in for N2O in France and the Netherlands • inclusion of the aviation sector in 2011 • The inclusion of new countries: Norway (+ Iceland and Liechtenstein) • The reduction in allocations (-10%)  Additional demand for EUAs • The emissions covered by the EU ETS represent: • 41% of European greenhouse gas emissions… • 11% of emissions from developed nations … • 4% of the world’s total GHG emissions.

  10. EU ETS phase 2 : allocations Phase II Distribution of the 1,958 Mt of annual allowances Source: Mission Climat from CITL.

  11. The EU-ETS in 2006: the “most representative” year for Phase I

  12. The EU-ETS in 2008

  13. Comparison: 2006 versus 2008 23,40 14,36 30,53 3,46

  14. EU ETS Phase II: the use of Kyoto projects for EU ETS compliance • Emissions reductions outside the EU ETS • Possible import of Kyoto credits limited to 1,400 Mt over 2008-2012 (or 2008-2020?) Supply of CER credits before April 2013 Source: Mission Climat de la Caisse des Dépôts, August 2009

  15. JI : Potential growth of Joint Implementation in Europe • JI projects are also hosted by European countries • Eastern Europe: 287 million JI credits expected until 2012 • EU15: France, Germany, Spain, and Denmark have also developed procedures for hosting JI projects (+New Zealand) • Russia and Ukraine have hosted the majority of JI projects to date: • Russia: 211 million JI credits expected until 2012 • Ukraine: 25,9 million JI credits expected until 2012 • Bulgaria : 5,5 million JI credits Annual ERU from JI projects Source: UNEP/RISOE JI Pipeline, september, 2009

  16. Compliance 2008 by countries • 14 countries are short: Germany about 43,8 Mt; UK about 43,1 Mt • 14 countries are long : Slovakia with 6,7 Mt Source: CITL, Mission Climat of Caisse des Dépôts

  17. Compliance 2008 by sector • Two sectors are short: combustion sector about 204 MtC02 and refineries about 1,8 MtC02 Source: CITL, Mission Climat of Caisse des Dépôts

  18. EUA and CER surrendered for 2008 compliance CER – ERU use for 2008 compliance • Share of countries in which CER surrendered for 2008 compliance Source: CITL, Mission Climat of Caisse des Dépôts

  19. EU ETS Phase II: compliance results • Phase II 2008 – 2012: a short period with – 439 Mt Source: CITL, Mission Climat of Caisse des Dépôts

  20. Phase III: Reducing the allocation: an incentive for emission reduction • Energy climate package defines phase III rules: - 20% versus -30%? • Phase III features: • Extension of the market until 2020 • Decreasing the allocation cap • Towards a full auctioning? Source: Mission Climat of Caisse des Dépôts

  21. Which impact on the industry competitiveness? • No observed impact on market shares during Phase I… • But potential impact on the long term for energy intensive industries • All industries but power production at different levels • Indirect impact for electricity-intensive industries • Impacts of new features of the EU ETS to be assessed by the EC before December 2010 • Solutions? Free allocation, border tax adjustments, sectoral agreements…

  22. The EU ETS in the world • Possible links with other cap-and-trade programs: • Complete fungibility between ETS seems difficult, but the common use of projects mechanisms could be a first step. • First linking opportunities: RGGI, Australia, New Zealand • Looking toward the future: a US federal trading program? • How to get ready: • Voluntary agreements • Sectoral agreements • The next steps: • After Copenhagen, waiting for Mexico City…

More Related