An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDI GDE FM2Performed Tests and Results M. Steller Space Research Institute, Graz IWF/ÖAW GRAZ

  2. OverviewGDE Tests at RUAG • Board Level • Adjustments • Electrical test • Pre-integration • Electrical and functional test at bench • Box Level • Electrical and functional test after integration • Performance test • Environmental Tests at GDE Level • EMC tests • Vibration • Thermal cycling (ambient pressure) • Isolation and bonding • Magnetic moment tests (performed at/by IWF) IWF/ÖAW GRAZ

  3. OverviewGDE Tests at/by IWF • Incoming inspection • Bake-out • Calibration • Incoming inspection at UNH • Reports available at: ftp://ftp.iwf.oeaw.ac.at/pub/EDI_MMS/EDI_FM2/GDE/ IWF/ÖAW GRAZ

  4. Board Level Tests • DIG/ANA Board • Shared responsibility between RUAG and IWF • IWF performs tests for the digital part • RUAG performs adjustments and tests for analogue part • Content for digital part: • Power, clock, reset • DAC output for reference voltages with offset (onboard clock) • Interface to controller, interfaces to sensor, interface to gun • Pulse shaping for event channels, FPGA2 configuration, code delay • DAC bit stream, housekeeping • Report for digital part: EDI-IWF-REP-0241 • LV/HV Board • Adjustment of converter, secondary voltages, etc. • Test off all converter switch-OFF functions • Test of Optics HV outputs IWF/ÖAW GRAZ

  5. EMC Tests • Conducted Emission Test set-Up • Report: EDI-AAE-TRP-0031 IWF/ÖAW GRAZ

  6. EMC Results • Conducted EmissionCommon Mode IWF/ÖAW GRAZ

  7. EMC Results • Conducted EmissionDifferential ModePositive power line IWF/ÖAW GRAZ

  8. EMC Results • Conducted EmissionDifferential ModeNegative power line IWF/ÖAW GRAZ

  9. EMC Results • Inrush current • Converter ON • All switchable secondary supplies ON IWF/ÖAW GRAZ

  10. ResultsfromBonding &Isolation • Bonding test • GND stud to chassis and connector back-shells • Typically 0.9mOhm, maximum 1.7mOhm • Isolation test • Primary power inputs to secondary GND: >100MOhm • Primary GND to chassis: >100MOhm • Secondary GND to chassis: anti-parallel diodes O.K. • Inverse Polarity Protection: O.K. • Test performed prior and after thermal cycling • Report • EDI-AAE-TRP-0029 IWF/ÖAW GRAZ

  11. Vibration Test • Test set-up • Only GDE with top cover to close box • No sensor-gun dummy load as used for EQM • Report • EDI-AAE-TRP-0032 IWF/ÖAW GRAZ

  12. Vibration Test Results IWF/ÖAW GRAZ

  13. Performance Tests • Performance test executed at: • Ambient temperature • Maximum temperature • Minimum temperature • Ambient temperature • Test of power supply • Power consumption • Secondary voltages • Synchronization of converter • Sensor supply • Gun supply • Test of reference voltages • Optics reference voltages • Gun reference voltages IWF/ÖAW GRAZ

  14. Resultsfrom Performance Tests (1) • Ambient temperature • All requirements fulfilled • Maximum temperature • All requirements fulfilled • Report • See test summaryEDI-AAE-TRP-0018 IWF/ÖAW GRAZ

  15. Resultsfrom Performance Tests (2) • Minimum temperature • Few reference voltages slightly out of spec • Lower injector: 0.41% => 0.46% • Inner analyzer: 0.34% => 0.35% • Extractor: 0.31% => 0.33% • Gun XP: 0.18% => 0.21% IWF/ÖAW GRAZ

  16. IncomingInspection • Content • Connectivity to chassis, power GND, signal GND • Power consumption • Controller interface, sensor interface, correlator upload & readback • Test pulse synchronization, gun beam control • Supply voltages for gun • Reference voltages for the gun • HV outputs for the optics • Power consumption under nominal conditions • Report • EDI-IWF-REP-0270 IWF/ÖAW GRAZ