1 / 8

Manufacturing Screens for Assuring FPGA Operating Reliability

Manufacturing Screens for Assuring FPGA Operating Reliability. MAPLD International Conference September 7, 2005 Birds of a Feather Session J: PLD Failures, Analyses and the Impact on Systems Ronald Lake Aeroflex Colorado Springs www.aeroflex.com/radhardFPGA. Purpose of Investigation.

aldon
Download Presentation

Manufacturing Screens for Assuring FPGA Operating Reliability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manufacturing Screens for Assuring FPGA Operating Reliability MAPLD International Conference September 7, 2005 Birds of a Feather Session J: PLD Failures, Analyses and the Impact on Systems Ronald Lake Aeroflex Colorado Springs www.aeroflex.com/radhardFPGA MAPLD2005

  2. Purpose of Investigation • Problem / Concern: • How to guarantee ViaLink reliability for assured operation over 15 year mission • Un-programmed ViaLinks remain un-programmed • Programmed ViaLinks remain programmed and stable • Solution • Un-programmed ViaLink stress test • Step stress analysis • Burn-in and operating life test • Post stress ViaLink verification MAPLD2005

  3. ViaLink Stress Test • 100% of un-programmed FPGAs undergo ViaLink stress test • Stress test applied to 100% of ViaLinks • cross • row • column • Standard test for Aeroflex QML manufacturing flow • Three step procedure to check and stress ViaLinks • ViaLink checked at 80% of operating voltage • ViaLink stressed at >140% of maximum operating voltage • ViaLink rechecked at 80% of operating voltage Vpp Fuse Stress Fuse Post-Stress Read Fuse Pre-Stress Read MAPLD2005

  4. ViaLink Step Stress Analysis • Performed for wafer lot manufacturing acceptance • Devices randomly selected from units passing manufacturing stress screen • Step stress applied to all ViaLinks by group • Devices tested to failure • Stress voltage recorded for first failure MAPLD2005

  5. Un-programmed burn-in • Applied to 100% of un-programmed units passing manufacturing stress • Standard step in Aeroflex QML manufacturing flow • 240 hrs of 125°C burn-in at maximum operating conditions (Vcc=2.7V, Vccio=3.6V) • FPGAs dynamically stimulated during burn-in • After burn-in devices tested for quiescent current (Icc, Iccio) and un-programmed electrical test (3 temperature, min/typ/max voltage) • Percent defective allowable (PDA) <5% MAPLD2005

  6. Operating Life Summary • LTOL: 77 test units + 3 control • Randomly selected from multiple wafers • No ViaLink failures at 1000 Hrs stress • <3% change in propagation delay • Minimal change is quiescent and active currents • Units returned to LTOL stress for next 1000 Hr read point • HTOL: 77 test units + 3 control • Randomly selected from multiple wafers • No ViaLink failures at 1000 Hrs stress • <10% change in propagation delay • Minimal change in quiescent and active currents • Units returned to HTOL stress for next 1000 Hr read point MAPLD2005

  7. Post stress ViaLink verify • Performed on random selection of units after completion of stress • Used to examine both programmed and un-programmed ViaLinks • Additional capabilities allow monitoring ViaLink resistance MAPLD2005

  8. Summary • Aeroflex Colorado Springs QML manufacturing flow eliminates weak ViaLink material • Addresses primary failure modes in ViaLink / antifuse based PLDs and FPGAs • Auto-programming of un-programmed ViaLinks • Increasing resistance in programmed ViaLinks • Un-programmed ViaLink stress test lowers post burn-in defective rate <1% units failing three temp electrical test • Life test (HTOL and LTOL) show minimal change in quiescent currents and AC propagation delay paths • Post stress vialink verification shows no gross damage to programmed or un-programmed ViaLinks MAPLD2005

More Related