An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEED Cost & Benefits Habitat for Humanity of Broward Perry Ecton Executive Director Habitat for Humanity of Broward Mary Lou Bowman Cubbin Director of Construction Habitat for Humanity of Broward HFHB Sustainable & Affordable Homeownership Project Knight Plat Product Completion Est. 12-20-12

  2. Habitat for Humanity of Broward was founded in 1983. We have built 336 homes to date.

  3. LEED Certification Cost • HFH of Broward USGBC Annual Membership………………$300 • HFH of Broward USGBC S. FL. Chapter Membership……....$65 • LEED Project Registration w/ USGBC, FTL-91………......…$150 • Contract with a LEED AP/Field Agent..look for a donation..……… ……..$0 • Builder Fee paid to Provider (FSEC) and Field Agent…....$1,400 Preliminary rating $400 + PreDrywall Inspection $400 + Final Rating/Verification $600 • Charrette Builder & green rater + 3 of the following: architect, landscape architect, mechanical engineer, civil engineer, building science professional…look for a donation.. .$0 • HERS Rating………………………………………..……………$250 • TOTAL, excluding materials………….$2,165

  4. Innovation & Design Process 1. Integrated Project Planning 1.1 Preliminary Rating – PREREQ 1.2 Integrated Project Team 1.4 Design Charrette 2. Durability Management Process 2.1 Durability Planning – PREREQ 2.2 Durability Management – PREREQ 3. Innovative or Regional Design

  5. Location & Linkages 1. Site Selection 3. Preferred Locations 3.2 Infill 3.3 Previously Developed 4. Existing Infrastructure 5. Community Resources / Transit 5.2 Extensive 6. Access to Open Space

  6. Sustainable Sites 1. Site Stewardship 1.1 Erosion Controls During Construction – PREREQ 2. Landscaping 2.1 No Invasive Plants – PREREQ 2.5 Reduce Overall Irrigation Demand by at Least 20% 3. Local Heat Island Effect 4. Surface Water Management 4.1 Permeable Lot 6. Compact Development / Density 6.2 High (4.7 Acres Total)

  7. 2. Irrigation System 2.1 High Efficiency Irrigation System 3. Indoor Water Use 3.1 High-Efficiency Fixtures & Fittings upgrade from 2.5 gpm to 2.0 gpm shower head……….…......$25 Water Efficiency Energy & Atmosphere • 1. Optimize Energy Performance • 1.1 Performance of ENERGY STAR for Homes – PREREQ • HERS rating, noted previously $250 • Good HVAC Design • PREREQ…………….upgrade to energy star thermostat….…….$50 • Lighting Upgrade to CFL light bulbs..………...……….……......$28 • 11. Residential Refrigerant Management • 11.1 Refrigerant Charge Test – PREREQ • 11.2 Appropriate HVAC Refrigerants

  8. Materials & Resources 1. Material-Efficient Framing 1.1 Framing Order Waste Factor Limit – PREREQ 1.3 Detailed Cut List & Lumber Order 2. Environmentally Preferable Products 2.1 FSC Certified Tropical Wood – PREREQ 2.2 Environmentally Preferable Products 3. Waste Management 3.1 Construction Waste Management Planning – PREREQ Upgraded to SWS “Recycle” dumpster……………………..….$60 3.2 Construction Waste Reduction

  9. Indoor Environmental Quality 2. Combustion Venting 2.1 Basic Combustion Venting Measures – PREREQ 2.2 Enhanced Combustion Measures 4. Outdoor Air Ventilation 4.1 Basic Outdoor Air Ventilation – PREREQ 5. Local Exhaust 5.1 Basic Local Exhaust – PREREQ Upgrade to energy star bathroom exhaust fans…..…..$232 Range hood vented to outside……………………....…..$226 6. Distribution of Space Heating & Cooling 6.1 Room-by-Room Load Calculations – PREREQ

  10. Indoor Environmental Quality (cont.) 7. Air Filtering 7.1 Good – PREREQ upgrade A/C filter to Merv 8…………………………….$2 8. Contaminant Control 8.1 Indoor Contaminant Control During Construction 10. Garage Pollutant Protection 10.1 No HVAC in Garage – PREREQ 10.4 Detached Garage or No Garage

  11. Awareness & Education 1. Education of the Homeowner or Tenant 1.1 Basic Operations Training – PREREQ 1.3 Public Awareness added USGBC sign on site…………………………………$85 TOTAL, additional materials……………………………..……..$708 GRAND TOTAL………………………………………….….….$2873 SILVER LEED RATING

  12. Total Project Cost! $5.7 Million Value 4 Bedroom $111,000 3 Bedroom $109,000 1st Mortgage 4 Bedroom $49,500 3 Bedroom $47,500 2nd Mortgage 15-Year Grant Forgivable 3 or 4 Bedroom $54,500 3rd Mortgage 5-Year Grant Forgivable 3 or 4 Bedroom $7,000 Average Monthly Payment $685 Includes: Principle, Taxes, Insurance and HOA

  13. Thank You!