1. Teegalem Canal (48.15 km) 62,000 Ac

VELIGONDA PROJECT. 1. Teegalem Canal (48.15 km) 62,000 Ac. 2. EMC (199 km) 2,45,000 Ac. 3. Udayagiri Canal 52,000 Ac. In fall . 4. West Branch Canal 51,000 Ac. Regulator. 5. Supplementation 27,500 Ac.

aleda
Download Presentation

1. Teegalem Canal (48.15 km) 62,000 Ac

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac 2. EMC (199 km) 2,45,000 Ac 3. Udayagiri Canal 52,000 Ac In fall 4. West Branch Canal 51,000 Ac Regulator 5. Supplementation 27,500 Ac TOTAL 4,38,000 Ac Nallamalasagar FRL +244.00m Approach Cap. 53.85 TMC Channel 100 m PACKAGE-2 Peddi Reddipally Teegaleru Canal Reservoir (27.33 cumecs) Flood Flow Canal Foreshore of 48.15 km FRL +188m Tunnel Srisailam Sunkesula Gap 62000 Ac Cap. 2.023 TMC Reservoir (PACKAGE-3) 328 Cumecs Gottipadia Gap MDDL +834 ft 18.80 km Eastern Main Canal FRL +885 ft 23.20 km Kakarla Gap BL +842 ft km 24.45 Link Udayagiri 2,45,500 Ac PACKAGE-1 Channel Branch Canal 199 km PACKAGE-4 9.6 km 17.5 km Lift I 0.00 Turimella Reservoir 52000 Ac FRL +235 m Cap. 2.453 TMC GB Reservoir FRL +254.5 m Lift II Cap. 0.415 TMC Western Branch Canal Lift III (51,000 Ac) Under progress Racherls Tank Western FRL +237.3 m Canal 22.70 km

  2. VELIGONDA PROJECT

  3. VELIGONDA PROJECT CATEGORY-I

  4. VELIGONDA PROJECT Pkg.No. 1 : Construction of Tunnel from TBM from Kollamvagu in the foreshore of Srisailam Reservoir up to Guntur – Kurnool road including construction of head regulator, approach channel, exit channel. Name of the Contractor : M/s. SABIR,SEW&PRASAD(JV) Agreement Amount : Rs. 624.60 Crs. Agreement Date : 20-08-2005 Period of completion : 36 Months (12 milestones) Target date of completion : 8/2008 • Investigation : in progress • Designs : yet to be started • Execution : Yet to be started • Expenditure : 2005-2006 - Rs. 31.45 Crs. (Inc. Mob. Advance) • Land Acquisition : Required 65.86 Acres, Acquired 45.86 Acres • Bottlenecks : Forest clearance is awaited

  5. VELIGONDA PROJECT Pkg.No. 2 :Closing of Sunkesula Gap, excavation of feeder channel and Teegaleru canal including construction of CM & CD works and distributary system for 62,000 Ac. Name of the Contractor : M/s. Gayatri-Jayaprakash (JV) Agreement Amount : Rs. 254.50 Crs. Agreement Date : 09-11-2004 Period of completion : 30 Months (10 milestones) Target date of completion : 8/2007 • Investigation : Completed • Designs : yet to be started • Execution : in progress • Qty. of earth work done : 55,000 cum against 61,10,000 cum. • Expenditure : 2004-2005 - Rs. 12.73 Crs. • 2005-2006 - Rs. 42.76 Crs. • Cum. Exp. Inc. Mob. Adv. only - Rs. 55.49 Crs. • Land Acquisition : Required 6317 Acres, Acquired 378 Acres

  6. VELIGONDA PROJECT Pkg.No. 3 :Closing of Gottipadia Gap and excavation of Gottipadia canal including construction of CM & CD works and distributary system for 9500 Ac. Name of the Contractor : M/s. Larsen & Toubro Ltd., Agreement Amount : Rs. 380.00 Crs. Agreement Date : 08-11-2004 Period of completion : 30 Months (10 milestones) Target date of completion : 8/2007 • Investigation : Completed • Designs : in progress • Execution : in progress • Qty. of EW done : 369829.22 cum against 326250 cum • Qty. of concrete work done : 52,653 CuM against 108958 CuM. • Expenditure : 2004-2005 - Rs. 18.93 Crs. • 2005-2006 - Rs. 55.30 Crs. • Cum. Exp. Inc. Mob. Adv. only - Rs. 74.23 Crs. • Land Acquisition: Required 3899.02 Acres, Acquired 1303.28 Acres

  7. VELIGONDA PROJECT Pkg.No. 4 : Closing of Kakarla Gap by construction of NOF dam, excavation of link canal and part of eastern canal together with distributary system including CM & CD works for 47,500 Ac. Name of the Contractor : M/s. SCL – BSCPL (JV) Agreement Amount : Rs. 206.80 Crs. Agreement Date : 20-08-2005 Period of completion : 36 Months (12 milestones) Target date of completion : 8/2008 • Investigation : 18.90 Km length against 53.26 Km • Designs : in progress • Execution : Yet to be started • Qty. of earth work done : 35,000 cum against 86,350 cum • Expenditure : 2005-2006 - Rs. 17.80 Crs. (Inc. Mob. Advance) • Land Acquisition : Required 2716.56 Ac., Acquired 171.45 Ac. • Tunnel : Decision has to be taken for the ultimate stage i.e, 2nd tunnel of 9.2 M dia are increasing the existing tunnel of 7 M dia to 11 M dia.