1 / 21

ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR

ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR. BENIN BURKINA-FASO CAMEROON CENTRAL AFR REP CHAD CONGO BRAZZA COTE D ’IVOIRE EQUAT. GUINEA. France GABON MADAGASCAR MALI MAURITANIA NIGER SENEGAL TOGO.

aleta
Download Presentation

ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASECNAAGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR

  2. BENIN BURKINA-FASO CAMEROON CENTRAL AFR REP CHAD CONGO BRAZZA COTE D ’IVOIRE EQUAT. GUINEA France GABON MADAGASCAR MALI MAURITANIA NIGER SENEGAL TOGO AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR (ASECNA)

  3. ORGANIZATION

  4. 16 millions sq.km 6 FIRs /5 FIC ASECNA FIR NIAMEY FIR NDJAMENA FIR DAKAR FIR BRAZZAVILLE FIR DAKAR OCEANIC Agence pour la Sécurité de la Navigation Aérienne en Afrique et à Madagascar Siège Social : 32-38 Av. Jean Jaurès DAKAR B.P. 3144 Tél. :23.10.40 - Fax :23.46.54 Bénin-Burkina-Cameroun-Centrafrique-Congo-Côted’Ivoire-France-Gabon-Guinée Equatoriale-Madagascar-Mali-Mauritanie-Niger-Sénégal-Tchad-Togo FIR ANTANANARIVO

  5. SERVICES • ATS • COMMUNICATIONS (FIXE/MOBILE) • FLIGHT INSPECTION • FIRE FIGHTING • ENGINEERING

  6. RESSOURCES • AERONAUTICAL FEES (LANDING & EN ROUTE) • MEMBER STATES CONTRIBUTIONS ON THEIR NAT ’L ACTIVITIES ENTRUST TO ASECNA • LOANS

  7. COMMUNICATIONS • VHF NETWORK EXTENSION FOR MORE CONTROLLED AIRSPACE • SATCOM FOR AIR TRAFFIC CONTROL • AERONAUTICAL TELECOM NETWORK (ATN) • HF / DL - SATELLITE BACK UP

  8. NAVIGATION • GROUND BASED EQUIPMENTS IN CONTRIBUTION TO LOCAL OR WIDE AREA AUGMENTATION SYSTEMS

  9. SURVEILLANCE • SSR /NDJAMENA/BRAZZAVILLE • AUTOMATIQUE DEPENDANTE SURVEILLANCE (SITA / AIR AFRIQUE / COLLINS/ANAM) • AIR SITUATION DISPLAY FOR NON ADS FLIGHT • ADS/SSR • ADS-B • SURFACE MVT GUIDANCE

  10. ATM 1/2 • AUTOMATIC FLIGHT DATA PROCESSING • CONFLICT DETECTION AND CLEAR • FLEXIBLE AIR ROUTES (CONTINENTAL/OCEANIC ATL-INDIAN) • DARPs • CPDLC • D-FIS

  11. ATM 2/2 • REDUCED UPPER AIRSPACE • AREA TRAFFIC FLOW MANAGEMENT • HARMONIZATION OF TERMINAL AREA (TMAs) LIMITS • SUB REGIONAL ATM SYSTEMS INTEGRATION

  12. AVIONICS • AFI / LOW DENSITY TRAFFIC • FULL AUTONOMOUS AVIONICS ON BOARD OVERSEAS INT’L AIRLINES • LACK OF EQUIPMENT ON MAJOR DOMESTIC OR REGIONAL OPERATORS • B-RNAV • FAIR COST CNS/ATM SYSTEMS (DL/ADS/GNSS) VDL MODE • MODULAR BASIS

  13. ASECNA’S CNS/ATM IMPLEMENTATION COST • ACQUISITION/INSTALLATION/OPERATION (2000/2010) • COMMUNICATION 50 millions US$ • NAVIGATION 33 “ • SURVEILLANCE 42 “ • ATM 68 “ • TRAINING 16 “ • INFRASTRUCTURE 66 “ TOTAL 276 “

  14. COST/BENEFITS ANALYSIS

  15. FINANCING ASECNA’S CASE STUDY • DEVELOPMENTS/DEMONSTRATIONS & TRIALS • STOCK FUNDS • OPERATIONS INFRASTRUCTURE • TRADITIONAL EUROPEAN & AFRICAN FINANCIAL INSTITUTIONS

  16. EXISTING INFRASTRUCTURE • AFTN MODERNIZATION • INTERCONNECTION OF COMMUNICATIONS NETWORK • VHF COVERAGE /DATA LINK X 25 PROTOCOL • SADIS IMPLEMENTATION

  17. EXISTING INFRASTRUCTURE • LADGPS TRIALS IN DAKAR • GPS /PRIMARY/SUP. MEAN • WGS 84 • GNSS IMPLEMENTATION IN AFI • STUDY FOR EGNOS TEST BED • EGNOS/WAAS INTER OPERABILITY TESTS

  18. EXISTING INFRASTRUCTURE • ADS IN AFI WITH RKA / COLLINS /SITA • ENHANCEMENT TO FANS- /1/A

  19. EXISTING INFRASTRUCTURE • ATM INTEGRATION AND HARMONIZATION / 40 YEARS

  20. TRAINING • 15 SEMINARS OF SENSIBILIZATION • TRAINAIR PROGRAMM

More Related