“What are some of our moving targets?”

“What are some of our moving targets?”. FSD1 Building Program Growth. Ken Stevenson’s original program called for all three elementary schools to be a Pre-K through 5 th grade level with a capacity of 700 students. Therefore, please see the information below:. Relief School :

alexis
Download Presentation

“What are some of our moving targets?”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “What are some of our moving targets?”

  2. FSD1 Building Program Growth Ken Stevenson’s original program called for all three elementary schools to be a Pre-K through 5th grade level with a capacity of 700 students. Therefore, please see the information below: • Relief School: • Original Capacity 700 students now 948 students • Original Budget $17,697,919 now $18,900,000 • Original Size 84,000 sq. ft. now 92,000 sq. ft.

  3. IV. New Middle School: • Original Capacity 750, core 900 now 1,352 students • Original Budget $20,033,361 now $24,736,381 • Original Size 91,000 sq. ft. now 155,000 sq. ft. • FSD1 Building Program Growth

  4. FSD1 Building Program Growth • North Vista Elementary School: • Original Capacity 700 students now 1,226 students • Original Budget $17,697,919 now $20,027,581 • Original Size 84,000 sq. ft. now 106,561 sq. ft. **North Vista Elementary School four Pre-K classrooms are alternates. We are currently working through some site issues that could affect this budget.

  5. FSD1 Building Program Growth • Royall Elementary School: • Original Capacity 700 students now 1,008 students • Original Budget $17,061,074 now $20,027,581 • Original Size 84,000 sq. ft. now 108,000 sq. ft. **Royall Elementary School has two more Pre-K classrooms than the Relief School in the base bid.

  6. FSD1 Building Program Growth We don’t anticipate a cost increase in construction cost in the near future. However, Royall Elementary School could be affected by cost increases in the future.

  7. Lucy T. Davis Expenses • Copiers • PE Equipment • Music Equipment • Art Equipment • Kindergarten Supplies/Equipment • Digital Signage • Security (cameras)/Intrusion Detection • Time Clocks • Telephone system • Reading Recovery supplies • Classroom startup costs (books) • Media Center books • Kiln • Playground Equipment • Media Center Equipment • School startup costs • Office supplies – (i.e. 3 hole punch, staplers, toner)

  8. North Vista

  9. Sample Visualization Review Re-Use of existing North Vista Elementary Site Church

  10. New North Vista Elementary School Schedule • Complete Design June 15, 2012 • Early Site Package Bid May 15, 2012 • Early Site Package May15, 2012 to August 15, 2012 • Bid Phase June 15, 2012 to July 15, 2012 • Construction Phase August 15, 2012 to December 15, 2013

  11. Moving Considerations

  12. Pack up, label, and move teachers room

  13. “What are some Questions in house that have had financial implications?” • Outfitting labs needed at Lucy T. Davis Elementary? (* With consideration of the next new elementary school buildings.) • Should classrooms be supplied with instructional resources if not in use? • New facility opening day start up cost? • If not supplied now how would it be funded later? • Adequate workstations and resources per classroom?

  14. Computer Warranty Expiration Dates Royall: 182 December - 2014 Moore: 187 - May 2015 North Vista:191 - March 2015 Replace middle school computers - August 2014

  15. Future Capital Funding Needs to Refresh District Computers 2013-2014 – 1.5 Million 2014-2015 – 3.5 Million

  16. Existing Moore Considerations • Up fit Moore to Code to comply with OSF for the Royall population

  17. Mobile Units Relocation • Move from Royall to Moore • Relocate remainder of Mobiles from Royall • Transport & Setup Cost • Electricity • Plumbing • Water • Infrastructure • Data, Network, Potential Fiber Runs • Security • Sidewalks • Overhead Awnings • Decking

  18. Input from Royall Design Committee • Possible areas for input from the design committee for the new Royall Elementary project would include the following: • Preferred locations for support spaces including Reading Recovery, Resource Rooms, Speech, OT/PT, HI/VI, etc. need to be fine-tuned. • The Guidance Suite and Administration Area need to be reviewed and fine-tuned. • Final assignment of classrooms within a particular area (which rooms will be Kindergarten vs. Pre-K for example) need to be made, but switching rooms from one floor to another will be limited by code and state regulations. • Final arrangement of spaces within the Media Center and Kitchen need to be confirmed • Number and locations for other support spaces such as storage, mechanical and electrical rooms need to be finalized.

  19. New Royall Elementary School Schedule • Design Phase May 1, 2012 to February 1, 2013 • Bid Phase February 1, 2013 to April 1, 2013 • Contractor Mobilization May 1, 2013 to June 1, 2013 • Construction Phase Starts June 1, 2013 • Demolition Phase June 1, 2013 to August 1, 2013 • Construction Complete December 1, 2014 • Owner move-in December 1, 2014

  20. The moving pieces fuse together and take shape!

  21. The Puzzle begins to come together and we start to see the BIG PICTURE.

  22. New Middle - Moore • Lucy T. Davis • New Royall • New North Vista