Meeting Agenda 02-11-14

Meeting Agenda 02-11-14. Overview ( 概观 ) Genetic Algorithm and Levenberg -Marquardt Algorithm for SEAS scenario ( 遗传算法 和莱文贝 格 - 马夸特方法结果 ) Priority Rule ( 零件优先级 ) Optimization ( 优化 ). (1) Overview. Previous Week and Current Week:

alika
Download Presentation

Meeting Agenda 02-11-14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting Agenda 02-11-14 • Overview (概观) • Genetic Algorithm and Levenberg-Marquardt Algorithm for SEAS scenario (遗传算法和莱文贝格 - 马夸特方法结果) • Priority Rule (零件优先级) • Optimization (优化)

  2. (1) Overview • Previous Week and Current Week: • Implemented SA + LM for Neural Network weight training. (使用退火法+莱文贝格 - 马夸特方法训练人工神经网路) • Compared the results obtained by using SA + LM to those obtained by just using LM. (成果比较) • Implemented GA + LM for SEAS case study. (遗传算法+莱文贝格 - 马夸特方法结果) • Included a priority rule in the feasibility check. (建立零件优先级) • Next Week: • Continue our initial research on different optimization algorithms (持续研究不同的优化算法)

  3. (2) Genetic Algorithm and Levenberg-Marquardt Algorithm (遗传算法+莱文贝格 - 马夸特方法) • Simulation results with 28 scenarios for training, validation and testing • Refer to PDF

  4. (3) Priority Rule (零件优先级) • Ensures that higher priority work orders are processed before lower priority work orders. • Please see figure on next page.

  5. 4 7 1 5 8 6 2 32 11 3 9 12 13 10 14 15 16 17 33 18 34 19 20 21 • Six priority rules are established: • 7 and 8 need to be completed before 11 starts • 9 and 10 need to be completed before 12 starts • 4-6 and 11-12 need to be completed before 13 starts • 1-3 and 13 needs to be completed before 32 starts • 14-21 needs to be completed before 33 starts • 22- 33 need to be completed before 34 starts 22 23 24 25 26 27 28 29 30 31

  6. (4) Optimization (优化) Trained weight values/neural network Inputs/Outputs (given, decision) Neural Network Optimization Genetic Algorithm/Particle Swarm Generation of suggested decision KPI/Optimized Schedule Inputs (given) Trained Neural Network Repeat until stopping criteria satisfied