ALARA Performance at OPG. Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium. Overview. Introduction Dose Reduction Initiatives Human Performance Improvements Future Challenges. Dose Reduction Initiatives: Darlington Installation of Submicron Filtration.
E N D
ALARA Performance at • OPG Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium
Overview • Introduction • Dose Reduction Initiatives • Human PerformanceImprovements • Future Challenges
Dose Reduction Initiatives:DarlingtonInstallation of Submicron Filtration • HTS bleed filter pore size reduced in steps from 2 uM to 0.45 uM in May/2002 and 0.1 uM in Dec/2003 • Increased filter replacement rate was driven by dose rate not ΔP • Contribution to dose savings: 130 rem for Unit 1 since 2004
Dose Reduction Initiatives:Remote Monitoring • Teledosimetry for dose monitoring and Rx face scan Remote readout of gamma and tritium levels at airlock (HP)
Dose Reduction Initiatives: Shielding Applications • Water wall for on-power Airlock EQ work – 3 rem dose and 4 M$ outage critical path savings • Water bag for ECI hot spot shielding • Face shielding Rx Shield Block Data: Each block weighs 22 lbs with a 7” hole cut out 15 min and 14 mrem to install 35 blocks Shielding effectiveness: Before shielding – 90 mrem/h, after shielding – 42 mrem/h
Dose Reduction Initiatives: Decontamination • Application of strippable Decon Gel • Example: • HX1 room floor Coated and peeled the next day • Before – 5000 cpm • After - 0 cpm • Peeling - 4.5 mrem/h C
Internal Dose Reduction: Outage Tritium Reduction ALARA Plan • Action Levels established with pre-determined corrective actions • Reduce closure plug leakage (CP tightening, PHT low level drain state to reduce static pressure) • Install portable dryers (96% capacity factor, 24 drums of D2O, 1200 Ci extracted from vault air) • Contain and reduce tritium @ airlocks (H3 <0.1 MPCa outside AL) Munter Dryer
Human Performance Improvement:Impact of Worker Practice • Human performance has a large impact on the effectiveness of RPPE: • Good RP practice can increase protection factor (PF) by a factor of 2 • Human performance can be improved by communication and focused O&C’s 1st wave of intense communication
Human Performance Improvement:Example of Worker Communication Campaign Communication campaign to emphasize impact of unplugged time on tritium uptake: Video presentation and posters Outage handbook Safety meetings
Human Performance Improvement:Coaching, Monitoring & Follow-up Daily dose monitoring and follow-up of EPD dose and tritium uptake Action levels: • 3 uCi/l or 10 mrem EPD – follow-up with worker/supervisor • 10 uCi/l above planned or EPD alarm – department EFDR, SCR • 35 uCi/l above planned or 100 mrem above EPD alarm – root cause investigation Performance management • Focused observation and coaching (O&C) by RP staff • Interview by RPM and RHP for significant events or repeats • RP qualification review of worker and supervisor
ALARA Achievement Three Consecutive WANO Strengths in ALARA 2007, 2008 WANO: • High standards in RP have been set and achieved • Robust controls prevent unplanned exposures • Extensive ALARA planning, innovative shielding and aggressive tritium reduction • Reactor face shielding • On-line tritium / gamma system
Future Challenges:2. Reduce γ dose rate in HT system by 25% by 2011 • Gamma scans identify Co-60 as the dominant source of radiation • More than 80% of Co-60 originates from FM stellite ram balls • Long term plan: COG joint/R&D project to develop replacement • Short term plan: FM filtration improvement – submicron filters & IX