An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MERIT layout in TT2/TT2A/TT10 CERN AB-ATB http://cern.ch/proj-hiptarget VRVS session, Jan. 2006 CERN AB-ATB

  2. ACAD drawing • Preliminary version published on the web: • EDMS: https://edms.cern.ch/document/695011 • Future versions are always to be found there, check regularly • Viewable with AutoCAD, but also with eDrawings Items indicated • Z=0 definitely defined • Indicators for mercury loop, solenoid, beam attenuator, quadrupoles, beam diagnostics, collimator, passage TT2 to TT2A, auxiliary equipment, N2 exhaust, ... CERN AB-ATB

  3. Layout file (ACAD) auxiliary equipment: DVB, racks, electronics, ... N2 exhaust Passage TT2/TT2A Hg loop CERN AB-ATB solenoid

  4. Z=0 and periphery CERN AB-ATB

  5. Soon to come • Cryogenic lines • End of TT2A, separation to nToF target • Exact location of quadrupoles • Transport “kinematics” • Cooling plant of nToF in TT2/TT2A junction • Do we require vacuum pipe in TT2A? (l=15 m) • ... CERN AB-ATB

  6. Open issues Input required from collaboration • ... • Size & location of passage TT2  TT2A (cryogenics, Hg loop, diagnostics, ...) • A list should be setup with all requests (send e-mail) • Requests should contain: sizing, location, quantity, special requirements • Space for solenoid connections (bus bar, cryo, ...) • To define spacing between solenoid and collimator/BI • Space allocation in TT2 for auxiliary equipment (ALL) • location, size, special requirements • ... CERN AB-ATB