1 / 3

St. Louis District LD 25 Approach RRAT

St. Louis District LD 25 Approach RRAT. FY 14 RRAT– LD 25 Approach. LD 25 Approach Structures Four Chevrons Constructed on the LDB, One Chevron Constructed on the RDB. Awarded in late FY12, constructed in FY13 for a total $3.2M

Download Presentation

St. Louis District LD 25 Approach RRAT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. St. Louis District LD 25 ApproachRRAT

  2. FY 14 RRAT– LD 25 Approach • LD 25 Approach Structures • Four Chevrons Constructed on the LDB, One Chevron Constructed on the RDB. • Awarded in late FY12, constructed in FY13 for a total $3.2M • Reduce a repetitive dredging location and provide better alignment to the entrance of the lock chamber • No dredging required during 2013 dredge season.

  3. FY 14 RRAT– LD 25 Approach LD 25 Approach Looking DS

More Related