An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Planning Speculative Production Capacity Reactive Production Capacity Retail Selling Initial Forecast Las Vegas Orders November March September

  2. Criteria for Ordering Less Risky Styles in November • Order styles with the lowest uncertainty (standard deviation) • Order styles with the highest demand (mean) • Order styles with the lowest price (wholesale) • Order styles with demand that is more than twice the minimum production quantity

  3. First Period Production Quantity

  4. Reduce Constraints • REDUCE MINIMUM LOT-SIZE CONSTRAINTS • Lean manufacturing • More efficient cutting equipment (for smaller lots) • Invest in worker cross-training • INCREASING REACTIVE CAPACITY • Longer work force hours during peak season • Use more subcontractor capacity during peak season • Increase total Alpine capacity • Reduce manufacturing and raw material lead-times • Use common components, e.g., zippers, rings • Invite most representative retailers for January “Early-Write”