1 / 26

Tercero phase II new Construction, LEED GOLD

Tercero phase II new Construction, LEED GOLD. David Mogavero Patrice Coffman. Project Profile. Tercero Student Housing, Phase II 155,000 square feet $35 million 592 beds Sep. 2010 completion Architect: Mogavero Notestine Associates Contractor: Brown Construction. Energy.

alodie
Download Presentation

Tercero phase II new Construction, LEED GOLD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tercero phase IInew Construction, LEED GOLD David Mogavero Patrice Coffman

  2. Project Profile • Tercero Student Housing, Phase II • 155,000 square feet • $35 million • 592 beds • Sep. 2010 completion • Architect: Mogavero Notestine Associates • Contractor: Brown Construction

  3. Energy • exceeded Title 24 by 32% • savings of 572,145 kWh + 3,576 therms = $52,744 • high-performance windows • solar thermal

  4. Water • project reduction of water use by 41% • 30% from fixtures • 11% from process water

  5. Indoor Environment • increased ventilation by 30% • rapidly renewable material • recycled content material • low or no VOC • lighting controls

  6. Innovation • Green Cleaning Policy & Program • education program (CIR 9/24/2001) • “green” furniture • building metering

  7. Occupant Satisfaction • 93.3% of occupants are satisfied • reliance on natural light

  8. Cuarto Dining CommonsCommercial Interiors, LEED GOLD David Mogavero Patrice Coffman

  9. Project Profile • Cuarto Dining Commons • 18,430 square feet • $7.9 million • Sep. 2010 completion • design/build • Design Architect: Stafford King Wiese • Architect of Record: Mogavero Notestine Associates • Contractor: Valley Construction

  10. Existing Interior • cafeteria style • low ceilings • dark • small rooms • multiple renovations

  11. Design – First Floor

  12. Design – Second Floor

  13. Energy • 25% more efficient than Title 24-2001 • 40% reduction in lighting density • solar thermal • Melink system

  14. Interior

  15. Interior

  16. Outcome • a destination • showcase dining facility • support UC sustainable food goals • education program (CIR 9/24/2001)

  17. Contact and Credit Information David Mogavero dmogavero@mognot.com Patrice Coffman pcoffman@ucdavis.edu images from Frank Domin, Christopher Fallon, Julianne Nola, UC Davis, and Mogavero Notestine Associates

  18. Thank you for your time! QUESTIONS? This concludes The American Institute of Architects Continuing Education Systems Program

More Related