Getting your Wind Project off the Ground • Wind viewer to assess any potential sites • Apply for high level site assessment • Feasibility study • economics • Permits • Design and Construction
Ideal Wind Site Characteristics • Wind Speed: min 6.0 m/s at 70m height • Away from Airports and residences • Transportation Access to Site • Interconnection point close by • No Endangered Species • No Wetlands Williams Stone 600 kW Vestas turbine Otis, MA
Wind Viewer http://maps.massgis.state.ma.us/wind/
Incentives for Wind Projects • Commonwealth Wind • Commercial Scale • Community Scale • Micro • Green Communities • Net Metering • Renewable Energy Certificates
Getting your Solar Project off the Ground Ideal Site Characteristics Project Development Site selection Feasibility Permits Design and Construction • Large open space • Flat • Interconnection point close • Wetlands • Endangered Species
Incentives for Solar RPS Solar Carve-Out 8
RPS Solar Carve-Out • S-RECs, Solar Carve-out, Solar Credit Clearinghouse • Renewable Portfolio Standard (RPS) • 5% of load from qualified renewable energy projects • Small percentage from qualified solar PV projects • Alternative Compliance Payment of $600/MWh • 2MW per meter • 2010 use of the Solar Credit Clearinghouse Auction Account for 10 years
Additional Solar Incentives • Green Communities • Net Metering • RPS Class 1 Renewable Energy Certificates (for projects greater than 2MW per meter)