An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARA Weekly Report Jiwoo Nam Mar 29 2012 NTU Weekly Group Meeting

  2. What have been done(Mar 29-Apr 04) • NTU-UW Meeting (Apr 30) Part Purchasing through the NTU-UW contract Documents archive in IcecubeDocshare (Drawings etc.)

  3. Production Plan ARA1: ? - New DAQ box (Housing, ATRI, TDAs, DDAs, SBC, etc.) : Responsible institution? Volunteer? - Testing: Either at NTU with ARA2 or UW with ARA3 ARA2: NTU - DAQ box: NTU w/parts from OSU - Power box: UW ships to NTU - Fiber modules: Some built already, remainder NTU - Downhole systems (cables, antennas, LNAs): NTU - Cal system: UMD ships to NTU - Integration & full system testing: NTU - Shipment to Pole: NTU ARA3: UW - DAQ box: UW w/parts from OSU - Power box: UW  NTU - Fiber modules: NTU? UW? - Downhole systems: NTU - Cal system: UMD - Subsystems FULLY tested where manufactured, DAQ tested with vertical slice (see below) - Shipment to Pole by manufacturing group Vertical slice/ARA Northern Hemisphere Test System (ANHTS): UW - DAQ box: UW w/parts from OSU - Power box: UW - Fiber modules: 2RX & 2TX, NTU? UW? - Downhole digitizers: ULB - Downhole systems: NTU - Cal system: UMD - System testing: UW - Shipment to UW

  4. NTU Production Plan Summary • ARA-1 DAQ Box: TBD • ARA-2 Full system except PW and CAL • ARA-3 DAQ-Box, Antennas, LNA boxes • Spare/Vertical Slice DAQ-Box Antennas, LNA boxes (2 strings) 3 DAQ Boxes and 2 1/2 strings LNA+Antennas

  5. Purchasing Items through UW

  6. What to do(Apr 5 - 11) • Purchasing Purchasing Request to UW • Downhole Team & Surface Team to continue • Anechoic Chamber movement (From Apr 16) • Expensive stuffs to be stored at safe room (Apr 13-14)