ARA Weekly Report. Jiwoo Nam Mar 29 2012 NTU Weekly Group Meeting. What have been done (Mar 29-Apr 04). NTU-UW Meeting (Apr 30) Part Purchasing t hrough the NTU-UW contract Documents archive in Icecube Docshare (Drawings etc.) . Production Plan. ARA1: ?
E N D
ARA Weekly Report Jiwoo Nam Mar 29 2012 NTU Weekly Group Meeting
What have been done(Mar 29-Apr 04) • NTU-UW Meeting (Apr 30) Part Purchasing through the NTU-UW contract Documents archive in IcecubeDocshare (Drawings etc.)
Production Plan ARA1: ? - New DAQ box (Housing, ATRI, TDAs, DDAs, SBC, etc.) : Responsible institution? Volunteer? - Testing: Either at NTU with ARA2 or UW with ARA3 ARA2: NTU - DAQ box: NTU w/parts from OSU - Power box: UW ships to NTU - Fiber modules: Some built already, remainder NTU - Downhole systems (cables, antennas, LNAs): NTU - Cal system: UMD ships to NTU - Integration & full system testing: NTU - Shipment to Pole: NTU ARA3: UW - DAQ box: UW w/parts from OSU - Power box: UW NTU - Fiber modules: NTU? UW? - Downhole systems: NTU - Cal system: UMD - Subsystems FULLY tested where manufactured, DAQ tested with vertical slice (see below) - Shipment to Pole by manufacturing group Vertical slice/ARA Northern Hemisphere Test System (ANHTS): UW - DAQ box: UW w/parts from OSU - Power box: UW - Fiber modules: 2RX & 2TX, NTU? UW? - Downhole digitizers: ULB - Downhole systems: NTU - Cal system: UMD - System testing: UW - Shipment to UW
NTU Production Plan Summary • ARA-1 DAQ Box: TBD • ARA-2 Full system except PW and CAL • ARA-3 DAQ-Box, Antennas, LNA boxes • Spare/Vertical Slice DAQ-Box Antennas, LNA boxes (2 strings) 3 DAQ Boxes and 2 1/2 strings LNA+Antennas
What to do(Apr 5 - 11) • Purchasing Purchasing Request to UW • Downhole Team & Surface Team to continue • Anechoic Chamber movement (From Apr 16) • Expensive stuffs to be stored at safe room (Apr 13-14)