120 likes | 284 Views
Fall Workshop 2012. PIC/EIV. Guidance for Requesting M ID for new Users and PHA Systems Security Guide. PIC Homepage - Request new M ID http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/systems/pic PIH REAC Online Systems – Request new M ID
E N D
Fall Workshop 2012 PIC/EIV
Guidance for Requesting M ID for new Users and PHA Systems Security Guide PIC Homepage - Request new M ID • http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/systems/pic PIH REAC Online Systems – Request new M ID • http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/reac/online PHA Systems Security Guide for WASS (Web Access Security Subsystem) • http://www.hud.gov/offices/reac/products/wass/wass_user_manual.cfm
Important Webpage Links for PIC PIC Homepage • http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/systems/pic Job Aid for Unit Tenant Status Changes • http://portal.hud.gov/hudportal/documents/huddoc?id=DOC_11609.pdf Job Aid for Tenant ID Management • http://portal.hud.gov/hudportal/documents/huddoc?id=job_aid_tenant_id-mgt.pdf
Important PIH Notices for PIC PIH 2011-65 • Timely Reporting Requirements of the Family Report (form HUD-50058 and form HUD- 50058 MTW) into the Public and Indian Housing Information Center PIH 2011-7 • Guidance on IMS/PIC Development Sub-Module Reporting and Validation PIH 2012-30 • Public Housing Operating Subsidy Eligibility Calculations for Calendar Year 2013
Access the Occupancy/Aging Report in PIC to determine Occupancy Rate • Access the Development submodule in PIC • Click on the Reports tab and select the Occ/Aging Report subtab • Click the “Select/Deselect” box to select your Project number(s) • Select Report Type “Aging” • Click “Generate Report” button Number of Vacant Units divided by Total Number of Units = Vacancy Rate 100 – Vacancy Rate = Occu-pancy Rate This report can also be used to document monthly vacancies/units occupied for the Unit Months Leased reported on the Financial Data Schedules
Excerpt from Job Aid – Propose a unit for a change in status (page 4, 5, and 6) HA User with New Unit Tenant Status (HUD Approval Required) • The general procedure for an HA User with New Unit Tenant Status (HUD • Approval Required) is as follows: • 1. Go into PIC Development submodule and select the Development. • 2. Select a vacant unit in the Unit tab. • 3. Click the ‘Modify’ button beside the ‘Unit Tenant Status’ field (Figure 1). • 4. A new screen will open (see Figure 2). • 5. Select the ‘Vacant – HUD Approved’ or ‘Non-dwelling’ button. • 6. Select a subgroup from the associated pull-down list (Figures 4 and 5). • 7. Enter the effective date of the change.
Excerpt from Job Aid – Propose a unit for a change in status - Continued 8. Select a reason for the change from the pull-down list. 9. Enter any explanatory comment. 10.Click the ‘Propose Change’ button. 11.The unit tenant status change will be effective on the date entered if it is approved by HUD. 12.If HUD does not approve (rejects) it, it will not become effective. Figure 2 (page 7) is a screen shot of the new ‘Unit Tenant Status Changes’ screen as it first opens after the HA user clicks ‘Modify’. The lower part of the screen is divided into a left and a right portion for the HA user. The left portion is for the ‘New Unit Tenant Status (No HUD Approval)’ actions. The right portion is for the ‘New Unit Tenant Status (HUD Approval Required)’ actions.
Excerpt from Job Aid – Propose a unit for a change in status - Continued Once the ‘Propose Change’ button is hit by the HA, the proposed change in status appears in a list on a separate page under the ‘Submission’ tab shown above, which is adjacent to the right of the ‘Unit’ tab. Select the ‘Submit Tenant Status Changes’ sub-tab to see the list. Further changes to the unit data can be made after the ‘Propose Change’ button is initially clicked any time until the proposed changes are actually submitted under the Submission tab as shown in Figures 11 and 12. On the ‘Submit Tenant Status Changes’ page, all changes to the unit tenant status can be submitted at the same time. Submission of status changes temporarily locks all of the building and unit data until the HUD Field Office approves or rejects the proposed status changes.
Links to PIC User Manuals IMS/PIC User Manuals • http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/systems/pic/userguides Archived IMS/PIC User Manuals • http://portal.hud.gov/hudportal/HUD?src=/program_offices/public_indian_housing/systems/pic/userguides-arc
Adding PHA Contacts and Board Commissioner Contact Information in Housing Authority Submodule User Manuals for the Housing Authority Submodule (IMS/PIC Business Partners) – use to change PHA Contacts and Board Commissioner Contact Information (page 31) • http://portal.hud.gov/hudportal/documents/huddoc?id=DOC_11626.pdf