1 / 8

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

Wastewater Project of the Year. City of Cove Wastewater System Improvements. PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School. Project Summary. $1.6 million wastewater system improvements project Included two new storage ponds and a new effluent irrigation area

Download Presentation

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wastewater Project of the Year City of Cove Wastewater System Improvements PNCWA Operators ConferenceEastern Oregon Region AWWA/PNCWA Short School

  2. Project Summary • $1.6 million wastewater system improvements project • Included two new storage ponds and a new effluent irrigation area • Completed for a 20-year design criteria • USDA Rural Development and DEQ CWSRF funding • The City of Cove is now in full compliance with DEQ regulations

  3. Construction of treated effluent pipeline to storage ponds

  4. New 30-Acre Storage Lagoon

  5. Valves

  6. Existing Control Building Modifications

  7. Storage Ponds Control Valves

  8. Irrigation Pipeline Flowmeter