An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ctcLink Project UpdateFebruary 2014PPMS User Group Meeting Rita Lauzon

  2. Implementation of modern software to replace our legacy system in the areas of student/academic, finance, and HR-payroll‘Anytime, anywhere’ access to online tools and services for students, faculty and staff A set of interconnected software modules to help us streamline and standardize business processes across all colleges 2

  3. Why ctcLink? • Necessity • Aging Legacy system • Keep pace with innovations in education, technology • New way of thinking and doing business • Better online (common) experience for all • Student (self-service) Center • Faculty (self-service) Center • Advisor (self-service) Center • Employee (self-service) Center • One single, centralized system • Improved Access to Data • Online Workflow processes • Cross-college/department integration 3

  4. ctcLink: Guiding Principles 10 Guiding Principles adopted by WACTC and SBCTC board in late 2009 Feb, 2013, presidents reaffirmed importance of adhering to principles Example: “Customization at the system and campus level must be minimized and will be considered only as mandated by statutory requirement or a business case that benefits the system as a whole.” 4

  5. Today’s Topics • Project Timelines • Current Activities • Testing planning • Training • Other items of interest 5

  6. ctcLink Implementation Schedule 6

  7. Wave 1 Implementation Schedule Local Configuration and Security: Aug – Oct 2014 Data Conversion Validation: Aug – Dec 2014 Testing (includes user testing): Oct 2014 – March 2015 Training: Feb – May 2015 Go-Live with ctcLink: May 2015 Stabilize/Optimize: June – Nov 2015 7

  8. Wave 2 Implementation Schedule Local Configuration and Security: June - Sept 2015 Data Conversion Validation: May - Aug 2015 Testing (includes user testing): Oct 2015 – May 2016 Training: Dec 2015 – May 2016 Go-Live with ctcLink: May 2016 Stabilize/Optimize: June – Nov 2016 8

  9. Wave 3 Implementation Schedule Local Configuration and Security: June - Sept 2016 Data Conversion Validation: May - Aug 2016 Testing (includes user testing): Oct 2016 – May 2017 Training: Dec 2016 – May 2017 Go-Live with ctcLink: May 2017 Stabilize/Optimize: June – Nov 2017 9

  10. Foundation Decisions, BPAs, Configuration • System build based on BPA findings • Reporting Plan • Security Strategy – Complete • Portal Strategy – Complete • Conversion Strategy – Complete • Reporting Strategy – Complete • GL Account Structure – Complete • Academic Structure – Complete • Bio / Demo Structure – Complete • Training Strategy – Complete • Business Process Diagrams • Security Definition • Business Processes • Technical Development • Training Plan Global data cleanup, mapping, conversion, validation • Validate requirements • Clarification webinars with SMEs as needed 10

  11. 242 Business Process Diagrams Monitor Health and Safety BPD Example: 11

  12. What’s happening now? (Part 1) • Wave 3 Kickoff and Wave 1 Critical Issues Sessions • College Teams Roles/Review (Project Manager role) • Readiness/Awareness Surveys (voluntary) • Business Process Change Analysis • System Configuration 12

  13. Job Code Configuration 13

  14. Pay Group Configuration 14

  15. Benefits Plan Configuration 15

  16. What’s happening now? (Part 2) • Preparing for Testing • Data Cleanup, Conversion, and FirstLink Data Validation • Supporting Systems Analysis • Bi-Weekly/Weekly college SMEs WebEx meetings 16

  17. Testing Plan 17

  18. Testing Timeline W1 Testing 18

  19. Training Training will be provided in a variety of formats: • Instructor-Led Training (ILT) classroom sessions on your campus • Online (web-based) self-paced training • Job Aids (available online as reference desktop procedure manuals) • Learning Labs for additional assistance with the classroom instructor • Individual on-site support as needed 19

  20. User Productivity Kit (UPK) We are using Oracle’s User Productivity Kit (UPK) to create training materials You can get a preview of UPK and some generic PeopleSoft processes at: http://tinyurl.com/wactc-upk Click the + until you get to a topic “Try It!” and “Print It!” modes are most useful 20

  21. Be Connected, Stay Informed • ctcLink.sbctc.edu College Resources • ctcLink Collaboration “365” site • Instructions to sign up for the Collaboration site are on College Resources page • ctcLink SME listservs • Campus Solutions (Student/Academic) – ctclinksme-cs • Finance – ctclinksme_fin • Financial Aid – ctclinksme-finaid • Human Capital Management (HR/Payroll)– ctclinksme-hcm • Technical –ctclinksme_tech • Reporting/Analytics – ctclinksme_rpt To join a list: http://www.sbctc.edu/docs/collegeaccess/it/_m-mailman-index.aspx#subscribe • Follow the ctcLinkblog: ctclink.wordpress.com • ctcLink college team and SMEs roster • Located on College Resources Homepage 21

  22. Askctclink@sbctc.edu Follow the ctcLink Blog: ctclink.wordpress.com Website: ctclink.sbctc.edu 22