1 / 16

0-LSL Impacts of RUC and Offline Non-Spin on 2011

0-LSL Impacts of RUC and Offline Non-Spin on 2011. Resmi Surendran. 0 – LSL Analysis Approach. D etermine the effect of LSL energy from OFFNS/ RUC when BP=LSL E xtent EOC to 0, relax LDL to 0 and rerun SCED clearing engine to get new lambda

ami
Download Presentation

0-LSL Impacts of RUC and Offline Non-Spin on 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 0-LSL Impacts of RUC and Offline Non-Spin on 2011 Resmi Surendran QMWG

  2. 0 – LSL Analysis Approach Determine the effect of LSL energy from OFFNS/ RUC when BP=LSL • Extent EOC to 0, relax LDL to 0 and rerun SCED clearing engine to get new lambda • Additional PNM for each SCED interval is estimated as • If original pnm = 0 then addition =max(0, new lambda-10*FIP)* time else if original pnm > 0 then addition = max(0, increase in lambda)* time • Make-whole payment needed is estimated as • ½ (new lambda – old lambda) * sum of relaxed LSL * time • Additional increase in cost is estimated as • (new lambda – old lambda) * total generation * time ERCOT Public

  3. 0 – LSL Studies • QSGR • Case study of March 2nd • OFFNS/ ONRUC • From Dec 1st 2010 to Jan 31st 2012 • For the OFFNS units with BP=LSL, apply the 180 floor to the unit EOC from 0 to HSL • For the ONRUC units with BP=LSL, apply the SWCAP floor to the unit EOC From 0 to HSL ERCOT Public

  4. Effect of Quick Start Resources Dispatch on March 2nd, 2012 • 0-LSL deployment from QSGR • 2756.9 MWh • Minimum 3 MW, Average 266.8 MW, Maximum 430 MW • Approach • Extended EOC to 0MW, set LDL to 0 for QSGRs dispatched by SCED at LSL and then reran SCED clearing engine • Results • Average system lambda increase is $80.5 • PNM addition is estimated to be $830 (FIP was 2.355) • Make whole payment is estimated to be 151k • Estimated additional increase in cost is 380k ERCOT Public

  5. 0 – LSL OFFNS/ ONRUC MW ERCOT Public

  6. 0- LSL OFFNS/ ONRUC Effective MW ERCOT Public

  7. Monthly Summary of 0-LSL for OFFNS/ONRUC ERCOT Public

  8. Summary of 0-LSL for OFFNS/ONRUC (Excluding Feb 2011) ERCOT Public

  9. Summary of 0-LSL for OFFNS/ONRUC (Dec 2010 – Jan 2012) ERCOT Public

  10. PNM Change for OFFNS/ONRUC (Dec 2010 – Jan 2012) ERCOT Public

  11. Monthly Estimated Impact for OFFNS/ONRUC (Excluding Feb 2011) ERCOT Public

  12. Percentiles of Estimated Impact for OFFNS/ONRUC (Excluding Feb 2011) ERCOT Public

  13. Appendix ERCOT Public

  14. PNM Change for OFFNS/ONRUC (Excluding Feb 2011) ERCOT Public

  15. Monthly Estimated Impact for OFFNS/ONRUC (Dec 2010 – Jan 2012) ERCOT Public

  16. Percentiles of Estimated Impact for OFFNS/ONRUC (Dec 2010 – Jan 2012) ERCOT Public