Thursday 29.11. after the MD. 04:00–07:00 Pilot ramp (3 on 3 nominal bunches with collisions in point 1/2/5/8) + asynch . dump test in collision 07:00-09:00: IR8 aperture measurement (M. Giovannozzi et al.). Planning. 10:00 – 13:00 Access :

amiel
Download Presentation

Thursday 29.11. after the MD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thursday 29.11. after the MD • 04:00–07:00 Pilot ramp (3 on 3 nominal bunches with collisions in point 1/2/5/8) + asynch. dump test in collision • 07:00-09:00: IR8 aperture measurement (M. Giovannozzi et al.)

  2. Planning • 10:00 – 13:00 Access: • ALICE network switch (US25) – Impact 22030 (16+0696) • 60 A PC RCBV27.L5B1 and RCBH26.R3B2L(RP required), sub-converters of RQD.A12, RQD.A23, RQF.A23. Contact V. Montabonnet • RB.A67 QPS_OK (communication problem MB.C13L7) • Sublimation MKI2/8 (UA) – Vac. Piquet • BLM (point 7 – PM76 - RP required) (contact: E. Effinger) • ATLAS (field off), CMS • BGI (point 4) – RP required (contact: M. Sapinski) • TED TI2? – RP required (contact – to be checked with SPS team) • BLM optical link – Point 4 (tbc) – RP required – Contact E. Effinger

  3. Planning cont. • 13:00-14:00 Pre-cycle • CMS should be ready for physics at 14:00 • 14:00 – 17:00 Bunch length reduction and heating (B. Salvant et al.) • Evening: Physics fill – satellites for ALICE • Tomorrow: • Short (1/2 hour) physics fill with high brightness beam (compression and merging) – 78 bunches (exact filling scheme tbd)