Gujarat State Municipal Energy Efficiency Project. Gujarat Urban Development Company Limited. CONTENTS……. GUDC Initiative for EEP in Gujarat Benefits for ULBs EEP Project frame work Project opportunities. GUDC.
E N D
Gujarat StateMunicipal Energy Efficiency Project Gujarat Urban Development Company Limited
CONTENTS…….. • GUDC • Initiative for EEP in Gujarat • Benefits for ULBs • EEP • Project frame work • Project opportunities.
GUDC GUDC, a Govt. of Gujarat undertaking, is a Company registered under the Companies Act 1956. • Mission • "To facilitate urban development by assisting state government and existing agencies in formulation of policy, institutional capacity building and project implementation, and to assist in the funding and implementation of projects“.
Gujarat Earthquake Rehabilitation and Reconstruction Project (GERRP) 14 Severely affected Town Selected Reconstruct with improved multi-hazard disaster resistant infrastructure. Micro Level Development Plan Project cost: 402 crores Projects Gujarat Urban Development Project - World Bank Project covers 10 town The project component : a) Reforms b) Capacity Building c) Investment Project cost: 162.5m $ (775 crores) World Bank Contribution: 130m$ Integrated Township Policy Undertook series of National and State wide Public Consultation- meeting with related department, institutions- experts- renowned international- national and local developers. The Government of Gujarat announced the GITP for public consultation.
Municipal Solid Waste Management in all ULBs along with “IEC Activity Regionalclustraization – First in the country to operationalise regional clustralization strategy; use of Technology - satellite data – GIS Developing Vermi/microbial Compost plant s in all ULBs Project cost: 371 crores Training in ULBs for awareness MSW M through IEC Activity CDM Cell GUDC is an Intermediary to avail carbon Credits from projects of urban Sector in Gujarat. Presently working on MSWM, BRTS, EEP in ULBs Projects. Projects Pool Finance Development Fund Initiated project development, preparing municipalities to increase creditworthiness in order to access capital market. Preparing to assess funds under the GOI , PFDF scheme. Partnered with UTI to structure the project and arrive at the optimal mechanism.
Gujarat HeritagePolicy under preparation. Stakeholder consultation underway. Pooling of resources and consolidation of experience. MorbiWatersupply24X7 Initiated project development, privatization of water supply distribution. Partnered with III to structure the project and arrive at the optimal mechanism. Projects UrbanSummit • Inaugurated by the Presided by H.E. The President of India. • High degree of participation : International conference: Delegates from International- National and Local participation. • MOU signed : 2.05 lakh crores • : 312 nos signed. • MOU signed with GUDC ; 1.36 lakh crores • - 54 Township and Infrastructure projects
Initiative for Energy Efficiency Project in Gujarat Municipal Energy Savings • Concept…. • To improve the overall Energy Efficiency in Municipalities that could lead to substantial savings and environmental benefits without any upfront investment from municipalities.
State of Gujarat • Gujarat • “The Urbanized State of India“ Situated on the western coast of the India. • 5 % of the India's total population • 6 %of geographical area. • High Rate of urbanization • 38 % of the state population living in urban areas . • Expected urban population by 2021 : 50% . • Urbanization Pattern in Gujarat • 7 Municipal Corporations • 161 Municipal Local Bodies • Escalating demand for better infrastructure facilities in urban areas
Gujarat- Potential • The major energy loads are: • Street lighting • Water pumping • Sewage pumping • Electrical distribution • Municipal building Sewage & Sanitation No. of Pumping Stations: 5 - 8 /ULB Water Supply: Capacity of Pumps: 5 - 20 hp No. of Pumping station:6-10 /ULB Street Lights: No. of Street light /ULB 700 – 3300 Types of Existing fittings: HPMV, HPSV, FTL • High potentials for energy savings & improvement of services No. of Street lights: 2,92,858 (As per Survey Report, 2001, for 143 ULBs)
Need….. • Municipalities face problems including: • Resource & Time constraints • Investment • Limited information availability (database) • Credit worthiness • Limited interest from private sector • Benefits to ULBs: • Savings in energy • Additional and improved infrastructure • Cost recovery of project from accrued savings in energy bills • Contribution in saving energy which can be diverted to other productive sector. • Contribution to reduction in pollution • Enhancement of public image
Energy Efficiency Project Municipal Body Energy Audit for baseline determination Identification of Energy Efficiency Projects Savings to Municipal Body Financial closure Savings from Energy Efficiency Escrow Account Recovery & Payments Implementation through ESCO Project Framework • FUNDINGOPTION • ESCO • By UDD, GoG • By IL&FS Ecosmart • (if required) Time Frame:? • ImplementationStrategies: • Phase:1 for 12 selected ULBs • Phase:2 for 149 ULBs
Project Implementation & Opportunities • Energy Saving Company • Identification and evaluation energy saving opportunities: • By Using Energy Audit tools • Recommendation a package of technical capability for improvement in street light, water pumping, sewage pumping, electricity utilization in municipal buildings etc. • Comprehensive Services • IGA & Financing. • Savings are guaranteed by Construction, implementation, monitoring and verification. • EnergyAuditor • The activity starts at the utility meters, locating all energy sources coming into a facility. • Quantification & Evaluation of energy streams into discrete functions (systems/equipments/appliances etc.) • Identification of energy and cost savings opportunities and Analyze the impact of improvements