Time Meeting: Agenda

Time Meeting: Agenda. Safety Schedule: Past, Present and Future RHIC and Experiment Reports Machine and System Reports AOB. Safety. Take 5 for Safety……….. Ed Lessard. Schedule: Past. Maintenance for JET (and STAR/PHENIX) on Wed., 13 Feb. APEX on Thursday, 14 Feb.

Download Presentation

Time Meeting: Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Meeting: Agenda • Safety • Schedule: Past, Present and Future • RHIC and Experiment Reports • Machine and System Reports • AOB

  2. Safety • Take 5 for Safety………..Ed Lessard

  3. Schedule: Past • Maintenance for JET (and STAR/PHENIX) on Wed., 13 Feb. • APEX on Thursday, 14 Feb. • Maximized the number of bunches in the machine, 109x109. • Did not see improvement in luminosity over 56x56. • Discovered a timing problem with Injection Kicker. • Decided to postpone radial polarization at PHENIX so we could ramp without rotators. Considering when to return to radial polarization for PHENIX. • PASS problems dumped a store on Sunday 17 Feb and kept RHIC off for ~12 hours. • Moved to 4 hour Physics stores + polarization measurements

  4. Schedule: Past (contin) • Polarimeter Set-Up and Tuning. • Studying polarization: • Profile measurements • At Injection • On the Ramp, if possible? • Prepare for b* squeeze.

  5. Schedule: Future Milestones Feb 15 PHYSICS RUNNING STARTS Feb 20 APEX: 5:00 AM – 5:00 PM Feb 25 NSRL Set-Up begins Feb 26 / 27 APEX/Maintenance Mar 3 NSRL starts running Mar 10      pp ends, 8:00 AM Start Low Energy Au-Au running Mar 12 RHIC Run 08 ends, 8:00 AM Cryo warm-Up Begins

  6. RHIC and Experiments Reports • RHIC – pp……………..….Christoph Montag • STAR......................................Lijuan Ruan • PHENIX.................................Mike Leitch • Polarimeter.……………………Haixin Huang • PP2PP…………………….…….Wlodek Guryn • BLIP…………………….…..Leonard Mausner • Operations.……………………Vadim Ptitsyn

  7. Machine Reports • Operations……..……….Peter Ingrassia • Sources……………….…Deepak Raparia • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Expt Support & Facilities…Al Pendzick • Instrumentation……...……..Tom Russo

  8. Systems Reports • Vacuum..........................Mike Mapes • Cryogenics…………..Andy Warkentien • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF………………………....Michael Ernst