An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of preparations for PPRP meeting 12May03 • MICE-UK asked (03Apr03) for full documentation (following PPRP guidelines) for consideration at the 12May03 meeting – deadline 28Apr03 • Cost to completion • Spend profile • Document in preparation. Key points: • Two stage process: • Approval for preparatory phase in fy 2003/04 without implying approval of full MICE project • Seek approval of full MICE project and UK contributions • Implies 2003/04 presented as request, profile 2004/07(08) presented as estimate • Work packages: • Beam and infrastructure • Focus pair and absorber integration • Instrumentation • Software

  2. Report from MICE project teams • Staff issues at RAL (from Paul Drumm): • cryogenic/hydrogen & RF expertise lacking • opportunity to recruit & train over next year? • Helpful to clarify possible sources of funding for 2003/04 and resources potentially available • News on preparation of MICE hall beam-line area: • PD proposed schedule for preparation work over next year to ISIS. ISIS have agreed. (Schedule on next slide) • Important step: JMPB should take a view! • For: Spread work out: reduce effort required in 04 shutdown or later shutdowns Strong message to non-UK funding agencies • Against: Loss of particles to HEP-test-beam area until beam line installed and re-commissioned • Personal view: arguments for strongly outweigh those against.I believe the work should start.

  3. Pre-installation schedule